EX-POST HODNOCENI REGIONALNICH ROZVOJOVYCH PROJEKTU

被引:1
作者
Halamek, Petr [1 ]
机构
[1] Masaryk Univ, Fac Econ & Adm, Dept Reg Econ & Adm, Lipova 41a, Brno 60200, Czech Republic
来源
19TH INTERNATIONAL COLLOQUIUM ON REGIONAL SCIENCES | 2016年
关键词
project evaluation; cost-benefit analysis; ex-post evaluation;
D O I
10.5817/CZ.MUNI.P210-8273-2016-16
中图分类号
F [经济];
学科分类号
02 ;
摘要
The goal of the paper is to highlight the issue of evaluation process of projects financed from public programs based only on the ex-ante data. The paper describes the risks connected with the absence of important parameters or socio-economic impacts related to the cost-benefit analysis or feasibility study in the ex-post project monitoring documents. The issue is analysed using the comparative method, comparing results obtained on the basis of ex-ante estimates of input values and the results gained from the actually measured values (results of the ex-post evaluation). Case study is prepared on the example of 10 projects concerning the investment to the cycle paths granted from the ROP Southeast, where 7 out of the 10 projects were overvalued with the average deviation by 65%.
引用
收藏
页码:139 / 144
页数:6
相关论文
共 12 条
  • [1] Rethinking cost-benefit analysis
    Adler, MD
    Posner, EA
    [J]. YALE LAW JOURNAL, 1999, 109 (02) : 165 - +
  • [2] eCBA s.r.o, 2010, AN POUZ CBA PRI IMPL
  • [3] Frechtling J., 2002, USER FRIENDLY HDB PR
  • [4] DEPENDENCY OF EFFICIENCY AND EFFECTIVENESS IN THE REGIONAL DEVELOPMENT PROJECTS - CASE ROP SE
    Halamek, Petr
    Vesely, Richard
    [J]. 17TH INTERNATIONAL COLLOQUIUM ON REGIONAL SCIENCES, 2014, : 402 - 408
  • [5] MINISTERSTVO FINANCI, 2015, MET POK FIN TOK PROG
  • [6] MINISTERSTVO PRO MISTNI ROZVOJ, 2014, MET POK PROR VYZ HOD
  • [7] MONITORING NAVSTEVNOSTI s.r.o., 2014, EK PRIN CYKL JIZN MO
  • [8] NADACE PARTNERSTVI, 2012, MON NAVST VYBR CYKL
  • [9] REGIONALNI RADA REGIONU SOUDRZNOSTI JIHOVYCHOD, 2012, HODN TAB ROP JV OBL
  • [10] Rosenau M. D., 2000, RIZENI PROJEKTU