A new load forecasting model considering planned load shedding effect

被引:5
作者
Alkaldy, Esam A. Hashim [1 ]
Albaqir, Maythem A. [2 ]
Hejazi, Maryam Sadat Akhavan [2 ]
机构
[1] Univ Kufa, Fac Elect Engn, Kufa, Iraq
[2] Univ Kashan, Fac Elect & Comp Engn, Kashan, Iran
关键词
Artificial intelligence; Forecasting; Energy sector; Electricity; Fuzzy-logic model; Fuzzy adaptive PSO;
D O I
10.1108/IJESM-03-2018-0008
中图分类号
C93 [管理学];
学科分类号
12 ; 1201 ; 1202 ; 120202 ;
摘要
Purpose Load forecasting is important to any electrical grid, but for the developing and third-world countries with power shortages, load forecasting is essential. When planed load shedding programs are implemented to face power shortage, a noticeable distortion to the load curves will happen, and this will make the load forecasting more difficult. Design/methodology/approach In this paper, a new load forecasting model is developed that can detect the effect of planned load shedding on the power consumption and estimate the load curve behavior without the shedding and with different shedding programs. A neuro-Fuzzy technique is used for the model, which is trained and tested with real data taken from one of the 11 KV feeders in Najaf city in Iraq to forecast the load for two days ahead for the four seasons. Load, temperature, time of the day and load shedding schedule for one month before are the input parameters for the training, and the load forecasting data for two days are estimated by the model. Findings To verify the model, the load is forecasted without shedding by the proposed model and compared to real data without shedding and the difference is acceptable. Originality/value The proposed model provides acceptable forecasting with the load shedding effect available and better than other models. The proposed model provides expected behavior of load with different shedding programs an issue helps to select the appropriate shedding program. The proposed model is useful to estimate the real demands by assuming load shedding hours to be zero and forecast the load. This is important in places suffer from grid problems and cannot supply full loads to calculate the peak demands as the case in Iraq.
引用
收藏
页码:149 / 165
页数:17
相关论文
共 18 条
[1]   A methodology for Electric Power Load Forecasting [J].
Almeshaiei, Eisa ;
Soltan, Hassan .
ALEXANDRIA ENGINEERING JOURNAL, 2011, 50 (02) :137-144
[2]  
[Anonymous], 2014, INT J COMPUT APPL
[3]  
[Anonymous], INT J COMPUT APPL
[4]   A Review of Short Term Load Forecasting using Artificial Neural Network Models [J].
Baliyan, Arjun ;
Gaurav, Kumar ;
Mishra, Sudhansu Kumar .
INTERNATIONAL CONFERENCE ON COMPUTER, COMMUNICATION AND CONVERGENCE (ICCC 2015), 2015, 48 :121-125
[5]  
Camelia U., 2006, IASMEWSEAS INT C ENE, P299
[6]   Neural Network-Based Model Design for Short-Term Load Forecast in Distribution Systems [J].
Ding, Ni ;
Benoit, Clementine ;
Foggia, Guillaume ;
Besanger, Yvon ;
Wurtz, Frederic .
IEEE TRANSACTIONS ON POWER SYSTEMS, 2016, 31 (01) :72-81
[7]  
Elias R.S., 2018, IEEE 2011 8 INT C
[8]  
Fahad M.U., 2014, Journal of Clean Energy Technologies, V2, P305
[9]   Short-term forecasting of the Abu Dhabi electricity load using multiple weather variables [J].
Friedrich, Luiz ;
Afshari, Afshin .
CLEAN, EFFICIENT AND AFFORDABLE ENERGY FOR A SUSTAINABLE FUTURE, 2015, 75 :3014-3026
[10]   Local Short and Middle Term Electricity Load Forecasting With Semi-Parametric Additive Models [J].
Goude, Yannig ;
Nedellec, Raphael ;
Kong, Nicolas .
IEEE TRANSACTIONS ON SMART GRID, 2014, 5 (01) :440-446