Supporting Daily Scrum Meetings with Change Structure

被引:0
作者
Rubart, Jessica [1 ]
Freykamp, Frank [1 ]
机构
[1] Arvato Serv, Gutersloh, Germany
来源
20TH ACM CONFERENCE ON HYPERTEXT AND HYPERMEDIA (HYPERTEXT 2009) | 2009年
关键词
Scrum; Daily Scrum Meeting; Task Board; Task Management; Spatial Hypertext; Cooperative Hypermedia; Change Link; Change Structure; Knowledge Management;
D O I
暂无
中图分类号
TP [自动化技术、计算机技术];
学科分类号
0812 ;
摘要
A flexible cooperative task board for supporting daily scrum meetings is described as an application of different hypermedia domains. In addition, change structure is introduced as a means to explicitly model changes in task management. It helps the scrum development team in a sprint retrospective to improve their planning.
引用
收藏
页码:57 / 61
页数:5
相关论文
共 8 条
[1]  
Haake J.M., 1999, P GROUP 99
[2]  
Marshall C.C., 1993, P 5 ACM C HYP SEATTL, P217
[3]  
PETERSEN RR, 2008, P ACM HYP C, P27
[4]  
ROBERTSON PK, 1990, PROCEEDINGS OF THE FIRST IEEE CONFERENCE ON VISUALIZATION - VISUALIZATION 90, P114, DOI 10.1109/VISUAL.1990.146372
[5]  
Rubart J., 2007, P HYP 07
[6]  
Schwaber K., 2004, Agile project management with Scrum
[7]  
SHIPMAN F., 2001, P 12 ACM C HYPERTEXT, P113
[8]  
Tzagarakis M., 2003, COMPUTER, V26, P139