The Economic Performance of a CUSITM t Control Chart for Monitoring Short Production Runs

被引:26
|
作者
Celano, Giovanni [1 ]
Castagliola, Philippe [2 ,3 ,5 ]
Trovato, Enrico [4 ]
机构
[1] Univ Catania, Dipartimento Ingn Ind, Catania, Italy
[2] Univ Nantes, LUNAM Univ, Nantes, France
[3] CNRS, UMR 6597, IRCCyN, Nantes, France
[4] Italian Navy, Augusta, GA, Italy
[5] Univ Nantes, Inst Univ Technol Nantes, Nantes, France
来源
QUALITY TECHNOLOGY AND QUANTITATIVE MANAGEMENT | 2012年 / 9卷 / 04期
关键词
Costs; CUSUM control chart; quality control; short production run; unknown process parameters; DESIGN; (X)OVER-BAR;
D O I
10.1080/16843703.2012.11673297
中图分类号
T [工业技术];
学科分类号
08 ;
摘要
At the start of a production run, the parameters of the distribution of a quality characteristic are frequently unknown. If the quality characteristic should by monitored on-line by means of a control chart and the production run length is too short, then it is impossible to get a sufficient Phase I number of samples allowing for the correct estimation of parameters and the evaluation of the chart's tentative limits. To overcome this problem, in this paper the economic design of a CUSUM t control chart that is able to monitor short production runs without the need of Phase I samples is proposed. A numerical analysis aimed at comparing the economic performance of the CUSUM t chart vs. the CUSLTM (X) over bar chart with known parameters has been performed on a benchmark of scenarios available from literature. The obtained results show that the expected economic loss associated to the implementation of the CUSLTM t chart is quite negligible with respect to the control chart with known parameters. An illustrative example is provided to show the CUSUM t chart's implementation.
引用
收藏
页码:329 / 354
页数:26
相关论文
共 30 条