The Economic Performance of a CUSITM t Control Chart for Monitoring Short Production Runs

被引:29
作者
Celano, Giovanni [1 ]
Castagliola, Philippe [2 ,3 ,5 ]
Trovato, Enrico [4 ]
机构
[1] Univ Catania, Dipartimento Ingn Ind, Catania, Italy
[2] Univ Nantes, LUNAM Univ, Nantes, France
[3] CNRS, UMR 6597, IRCCyN, Nantes, France
[4] Italian Navy, Augusta, GA, Italy
[5] Univ Nantes, Inst Univ Technol Nantes, Nantes, France
来源
QUALITY TECHNOLOGY AND QUANTITATIVE MANAGEMENT | 2012年 / 9卷 / 04期
关键词
Costs; CUSUM control chart; quality control; short production run; unknown process parameters; DESIGN; (X)OVER-BAR;
D O I
10.1080/16843703.2012.11673297
中图分类号
T [工业技术];
学科分类号
08 ;
摘要
At the start of a production run, the parameters of the distribution of a quality characteristic are frequently unknown. If the quality characteristic should by monitored on-line by means of a control chart and the production run length is too short, then it is impossible to get a sufficient Phase I number of samples allowing for the correct estimation of parameters and the evaluation of the chart's tentative limits. To overcome this problem, in this paper the economic design of a CUSUM t control chart that is able to monitor short production runs without the need of Phase I samples is proposed. A numerical analysis aimed at comparing the economic performance of the CUSUM t chart vs. the CUSLTM (X) over bar chart with known parameters has been performed on a benchmark of scenarios available from literature. The obtained results show that the expected economic loss associated to the implementation of the CUSLTM t chart is quite negligible with respect to the control chart with known parameters. An illustrative example is provided to show the CUSUM t chart's implementation.
引用
收藏
页码:329 / 354
页数:26
相关论文
共 20 条
[1]  
BROOK D, 1972, BIOMETRIKA, V59, P539
[2]   Constrained economic design of S control charts for random process shifts [J].
Castagliola, Philippe ;
Celano, Giovanni ;
Costa, Antonio ;
Fichera, Sergio .
INTERNATIONAL JOURNAL OF QUALITY & RELIABILITY MANAGEMENT, 2011, 28 (03) :298-+
[3]  
Celano Giovanni, 2010, International Journal of Quality Engineering and Technology, V1, P231, DOI 10.1504/IJQET.2010.034610
[4]   Shewhart and EWMA t Control Charts for Short Production Runs [J].
Celano, Giovanni ;
Castagliola, Philippe ;
Trovato, Enrico ;
Fichera, Sergio .
QUALITY AND RELIABILITY ENGINEERING INTERNATIONAL, 2011, 27 (03) :313-326
[5]  
DELCASTILLO E, 1994, QUAL RELIAB ENG INT, V10, P87, DOI 10.1002/qre.4680100203
[6]  
DelCastillo E, 1996, IIE TRANS, V28, P193, DOI 10.1080/07408179608966266
[7]  
HE F., 2008, Quality Technology and Quantitative Management, V5, P289
[8]   Economic design of an X chart for short-run production [J].
Ho, Linda Lee ;
Galindo Trindade, Anderson Laecio .
INTERNATIONAL JOURNAL OF PRODUCTION ECONOMICS, 2009, 120 (02) :613-624
[9]  
Ladany S. P., 1973, MANAGE SCI, V19, P219
[10]  
LUCAS JM, 1990, TECHNOMETRICS, V32, P1, DOI 10.2307/1269835