Construction Technologies of a Solid-Web Reinforced Concrete Arch Bridge for High-Speed Railway

被引:3
|
作者
Yu, Xiangdong [1 ]
Du, He [1 ]
Jing, Haiquan [1 ]
机构
[1] Cent South Univ, Sch Civil Engn, Changsha, Peoples R China
关键词
High-speed railway bridge; solid-web reinforced concrete arch bridge; finite element method; layer-by-layer construction scheme; bridge-track interaction; BEARING CAPACITY; DESIGN; TRACK;
D O I
10.1080/10168664.2019.1642830
中图分类号
TU [建筑科学];
学科分类号
0813 ;
摘要
Muhe Bridge is China's first solid-web reinforced concrete arch high-speed railway bridge. This bridge is located in the hinterland of the Qinling Mountains, Shaanxi Province, where the terrain is complicated. The excavation of the south abutment foundation broke the local rock masses and caused a few unloaded joints. Composite pile foundation and anchor cables combined with shotcrete anchor technology were proposed to strengthen the foundation. The displacements of the foundation before and after the reinforcement were calculated and compared using the finite element method. A layer-by-layer construction scheme was adopted to construct the arch ring because its cross-section was too large. Finally, the additional forces and displacement of the rail tracks were investigated through bridge-track interaction analyses. The effects of long-term shrinkage and creep on the longitudinal stress and displacement of the rail tracks were revealed for different construction schemes. The results provide significant engineering experience for the construction of solid-web reinforced concrete arch bridges.
引用
收藏
页码:280 / 286
页数:7
相关论文
共 50 条
  • [21] An integrated structural health monitoring system for the Xijiang high-speed railway arch bridge
    He, Xu-hui
    Shi, Kang
    Wu, Teng
    SMART STRUCTURES AND SYSTEMS, 2018, 21 (05) : 611 - 621
  • [22] Running Safety Analysis of High-speed Railway Arch Bridge under Seismic Excitations
    Huang, Bingkun
    Lei, Hujun
    Huang, Jiangze
    Liu, Wei
    2018 3RD INTERNATIONAL CONFERENCE ON SMART CITY AND SYSTEMS ENGINEERING (ICSCSE), 2018, : 86 - 91
  • [23] Mechanical analysis of through tied-arch composite bridge on high-speed railway
    Zhou, De
    Ye, Mei-Xin
    Luo, Ru-Deng
    Zhongnan Daxue Xuebao (Ziran Kexue Ban)/Journal of Central South University (Science and Technology), 2009, 40 (05): : 1457 - 1464
  • [24] Temperature pattern and extreme value of concrete high pier of high-speed railway bridge
    Dai G.
    Wang F.
    Ge H.
    Xiao Y.
    Rao H.
    Journal of Railway Science and Engineering, 2023, 20 (03) : 961 - 972
  • [25] On the fatigue behavior of precast concrete bridge decks in high-speed railway lines
    Sousa, C. F.
    Rocha, J. F.
    Calcada, R.
    Neves, A. S.
    BRIDGE MAINTENANCE, SAFETY, MANAGEMENT AND LIFE EXTENSION, 2014, : 1660 - 1665
  • [26] Construction of the Korean high-speed railway
    Kee-dong, Kang
    Rail International, 2000, 31 (10):
  • [27] Design and research on basket handle arch bridge by method of arch first and beam late in high-speed railway
    Zhao, Zhi-Jun
    Journal of Railway Engineering Society, 2013, 30 (12) : 41 - 45
  • [28] LOCAL STRESS ANALYSIS AND MODEL TEST OF ARCH FOOT FOR A STEEL BOX ARCH BRIDGE ON HIGH-SPEED RAILWAY
    He, X. H.
    Zhao, A. H.
    Scanlon, A.
    Asce, F.
    Peng, L. P.
    PROCEEDINGS OF THE ASME JOINT RAIL CONFERENCE, VOL 1: RAILROAD INFRASTRUCTURE ENGINEERING SAFETY, SECURITY AND ENVIRONMENT, 2010, : 121 - 128
  • [29] New technologies for high-risk tunnel construction in GuiyangGuangzhou high-speed railway
    Yubao Zhao
    Shougen Chen
    Xinrong Tan
    Ma Hui
    Journal of Modern Transportation, 2013, 21 (04) : 258 - 265
  • [30] Analysis of Construction Control of Arch-shaped Pylon Alignment of High-speed Railway Arch-shaped Pylon Cable-stayed Bridge
    Shi, Zhou
    Zhong, Meiling
    Yu, Wanqing
    Ji, Feng
    Journal of Railway Engineering Society, 2021, 38 (07) : 22 - 27