共 50 条
- [42] An MBO Algorithm for a Flow Shop Problem with Sequence-Dependent Setup Times PROCEEDINGS OF THE 2016 12TH WORLD CONGRESS ON INTELLIGENT CONTROL AND AUTOMATION (WCICA), 2016, : 2471 - 2474
- [45] New setup-oriented dispatching rules for a stochastic dynamic job shop manufacturing system with sequence-dependent setup times CONCURRENT ENGINEERING-RESEARCH AND APPLICATIONS, 2016, 24 (01): : 58 - 68
- [46] APPLYING A HYBRID MODEL TO SOLVE THE JOB-SHOP SCHEDULING PROBLEM WITH PREVENTIVE MAINTENANCE, SEQUENCE-DEPENDENT SETUP TIMES AND UNKNOWN PROCESSING TIMES 2022 WINTER SIMULATION CONFERENCE (WSC), 2022, : 1750 - 1761
- [50] Job shop scheduling with sequence dependent setup times to minimize makespan INTERNATIONAL JOURNAL OF INDUSTRIAL ENGINEERING-THEORY APPLICATIONS AND PRACTICE, 2003, 10 (04): : 455 - 461