Progress Risk Assessment for Spliced Network of Engineering Project Based on Improved PERT

被引:3
作者
Li Wenying [1 ]
Liu Xiaojun [1 ]
机构
[1] Xian Univ Architecture & Technol, Sch Management, Xian 710055, Peoples R China
来源
ENGINEERING AND RISK MANAGEMENT | 2011年 / 1卷
关键词
engineering project; spliced network; improved PERT; progress risk assessment;
D O I
10.1016/j.sepro.2011.08.042
中图分类号
T [工业技术];
学科分类号
08 ;
摘要
Aimed at the deficiency of the traditional PERT method in the risk assessment for engineering project progress, this paper has improved PERT method, so as to make it more suitable for engineering project risk assessment of spliced network. Firstly, in calculating project activity duration, it adopts response management theory and introduces double-buffering zone, so that the calculated project activity duration is more approximate to the realistic one. Meanwhile, the paper takes advantage of equivalent-weight probability method to revise the main path, so that the calculated project duration is more suitable for the realistic situation. Finally, the paper has further demonstrated the feasibility of the method by an engineering project case study.
引用
收藏
页码:271 / 278
页数:8
相关论文
共 9 条
[1]  
Chen Hu, 2001, MANAGEMENT ENG PROJE, P105
[2]  
KEEEFR D.L., 1993, MANAGE SCI, V39, P1086
[3]  
Li Quan-yun, 2005, BUILDING SCI, P88
[4]  
Tong He-jing, 2009, TECHNOLOGY EC, P125
[5]  
Wang Zhuo-fu, 2005, RISK MANAGEMENT RESP, P216
[6]  
Xie Xing-hao, 2010, J U ARCHITECTURE TEC, P795
[7]  
Xu Zhi-sheng, 2009, J DISASTER PREVENTIO, P84
[8]  
Yuan Ting-wei, 2010, SHANXI ARCHITECTURE, P211
[9]  
Zhao Zhen-yu, 2010, J ENG MANAGEMENT, P560