Management of Migrant Workers from Rural Areas and Reform of Labor Employment System in Construction Industry

被引:0
作者
Jiang Jian-lin [1 ]
Yan Xiao-dong [1 ]
Zheng Rong-yue [1 ]
机构
[1] Ningbo Univ, Fac Architectural, Ningbo 315211, Zhejiang, Peoples R China
来源
PROCEEDINGS OF THE 2ND INTERNATIONAL CONFERENCE ON RISK MANAGEMENT & ENGINEERING MANAGEMENT, VOLS 1 AND 2 | 2008年
关键词
construction industry; migrant workers; labor employment system; labor subcontracting;
D O I
暂无
中图分类号
F [经济];
学科分类号
02 ;
摘要
Migrant workers from rural areas are the main force of construction troop in China. They play a positive role for the development of construction industry. Employment modes of migrant workers and management issues of construction migrant workers are analyzed. There is closeable link between status quo of migrant workers management and reform of construction labor employment system. Deficiency and shortcoming of management measures of migrant workers at this stage are discussed. Systemic solution of management issues of construction migrant workers is proposed. Perfecting management of construction migrant workers should be integrated with reform of labor employment system. Labor subcontracting enterprises would be a dominant force of migrant workers management. And we must promote converting construction migrant workers into modern industrial workers of construction. It is good to establish a harmonious and efficient labor employment system. And it is helpful for healthy and sustainable development of construction industry.
引用
收藏
页码:720 / 725
页数:6
相关论文
共 22 条
  • [1] China Titanium Association, 2005, ARCHITECTURE CON FEB, P14
  • [2] *CONSTR ENT ASS CH, 2008, CONSTRUCTION ENT APR, P53
  • [3] DU X, 2005, J CHINA I IND RELATI, V19, P67
  • [4] GAO DH, 2003, CONSTRUCTION EC OCT, P56
  • [5] GU Y, 2005, CHINESE CONSULTING E, P15
  • [6] HE JZ, 2005, MANAGEMENT CONST JUL, P16
  • [7] HUANG ZY, 2004, BUILDING CONSTRUCTIO, V26, P164
  • [8] JIN L, 2006, CONSTRUCTION EC JAN, P30
  • [9] LI H, 2007, E CHINA EC MANAGEMEN, V21, P33
  • [10] LIAO YP, 2006, CONSTRUCTION EC MAR, P9