Cradle-to-gate sustainable target value design: integrating life cycle assessment and construction management for buildings

被引:53
作者
Russell-Smith, Sarah V. [1 ]
Lepech, Michael D. [1 ]
机构
[1] Stanford Univ, Dept Civil & Environm Engn, Stanford, CA 94305 USA
基金
美国国家科学基金会;
关键词
Life cycle assessment (LCA); Sustainable target value (STV); Construction management; Sustainable building; ENERGY USE; SCHEDULE; COST; TIME;
D O I
10.1016/j.jclepro.2015.03.044
中图分类号
X [环境科学、安全科学];
学科分类号
08 ; 0830 ;
摘要
Building stakeholders cannot easily quantify the environmental impacts of buildings as they accrue during construction. The goal of this work is to demonstrate a method to measure and manage the cradle-to-gate life cycle environmental impacts by linking environmental targets with modern construction management methods, to enable buildings to meet sustainable target values (STV). In this work, a construction activity-based computational framework was developed to enable stakeholders to reliably and efficiently construct cradle-to-gate life cycle models capturing environmental impacts including carbon and energy associated with material extraction, manufacture, transport to site, and construction. These models allow stakeholders to measure and manage impact accrual so as to not exceed STVs; without this framework, construction managers and other building stakeholders do not possess adequate environmental management tools to deliver projects consistently at or below STV. Specifically, the components developed are: (1) time dependent impact accrual budgets during construction and (2) impact measurement during construction. These benchmarks are used to determine whether a specific project is above or below target values, similar to methods for cost and schedule variance analysis. Two case studies were used to test this framework. This integration provides a life cycle assessment (LCA) modeling platform for management of environmental footprint during construction. (C) 2015 Published by Elsevier Ltd.
引用
收藏
页码:107 / 115
页数:9
相关论文
共 40 条
[1]   Time-lapse digital photography applied to project management [J].
Abed, J ;
Arditi, D .
JOURNAL OF CONSTRUCTION ENGINEERING AND MANAGEMENT-ASCE, 2002, 128 (06) :530-535
[2]  
[Anonymous], CHAR BUILD REL CONST
[3]  
[Anonymous], 2006, 14040 ISO
[4]  
Architecture2030, 2011, THE 2030 CHALL
[5]  
Barrie D.S., 1984, Professional Construction Management
[6]   Application of life-cycle assessment to early stage building design for reduced embodied environmental impacts [J].
Basbagill, J. ;
Flager, F. ;
Lepech, M. ;
Fischer, M. .
BUILDING AND ENVIRONMENT, 2013, 60 :81-92
[7]   Example of a Hybrid Life-Cycle Assessment of Construction Processes [J].
Bilec, Melissa ;
Ries, Robert ;
Matthews, H. Scott ;
Sharrard, Aurora L. .
JOURNAL OF INFRASTRUCTURE SYSTEMS, 2006, 12 (04) :207-215
[8]  
Blanchard S, 1998, THESIS U MICHIGAN AN
[9]   COST, SCHEDULE, AND TIME VARIANCES AND INTEGRATION [J].
CARR, RI .
JOURNAL OF CONSTRUCTION ENGINEERING AND MANAGEMENT-ASCE, 1993, 119 (02) :245-265
[10]  
Clark F., 1978, Applied cost engineering