共 40 条
[1]
Time-lapse digital photography applied to project management
[J].
JOURNAL OF CONSTRUCTION ENGINEERING AND MANAGEMENT-ASCE,
2002, 128 (06)
:530-535
[2]
[Anonymous], CHAR BUILD REL CONST
[3]
[Anonymous], 2006, 14040 ISO
[4]
Architecture2030, 2011, THE 2030 CHALL
[5]
Barrie D.S., 1984, Professional Construction Management
[8]
Blanchard S, 1998, THESIS U MICHIGAN AN
[9]
COST, SCHEDULE, AND TIME VARIANCES AND INTEGRATION
[J].
JOURNAL OF CONSTRUCTION ENGINEERING AND MANAGEMENT-ASCE,
1993, 119 (02)
:245-265
[10]
Clark F., 1978, Applied cost engineering