Balancing supply chain competitiveness and robustness through "virtual dual sourcing": Lessons from the Great East Japan Earthquake

被引:35
作者
Fujimoto, Takahiro [1 ]
Park, Young Won [1 ]
机构
[1] Univ Tokyo, Mfg Management Res Ctr, Tokyo 1138654, Japan
关键词
Supply chain disruption; Robustness; Competitiveness; Design portability; Virtual dual sourcing; The Great East Japan Earthquake (GEJE); DISRUPTION RISK; ARCHITECTURE; DISASTER; FIRMS;
D O I
10.1016/j.ijpe.2013.07.012
中图分类号
T [工业技术];
学科分类号
08 ;
摘要
In view of the unprecedented devastation of the Great East Japan Earthquake (GEJE), the psychological overreaction tends to emphasize the safety aspects at the expense of the basic principle of designing industrial supply chains that achieve competitiveness and robustness simultaneously. Manufacturing firms must identify the "weak links" in their supply chains in terms of dependence, visibility, substitutability and portability. The objectives of this paper are (1) to critically evaluate proposed changes to damaged supply chains such as adding inventory, adopting standardized parts, physically duplicating line production and equipment, and evacuating whole facilities; (2) to propose "virtual dual sourcing", in which the firm facing supply chain disruptions caused by a disaster carefully choose either to quickly recover a damaged line or transfer critical design information to a substitute line. Effective implementation of the virtual dual solution will require simultaneously enhancing the design information's portability, the supplier's visibility, and the firm's capabilities at process recovery and production substitution. (C) 2013 Published by Elsevier B.V.
引用
收藏
页码:429 / 436
页数:8
相关论文
共 41 条
[1]   IMPACT OF DISASTERS ON FIRMS IN DIFFERENT SECTORS: IMPLICATIONS FOR SUPPLY CHAINS [J].
Altay, Nezih ;
Ramirez, Andres .
JOURNAL OF SUPPLY CHAIN MANAGEMENT, 2010, 46 (04) :59-80
[2]  
[Anonymous], AIIM E DOC
[3]  
[Anonymous], ORG SCI
[4]  
[Anonymous], 2004, JAPANESE MANUFACTURI
[5]  
[Anonymous], SHOSHIKI KAGAKU
[6]  
[Anonymous], JAPANESE STYLE PROCE
[7]   DOCUMENT-CENTERED INFORMATION-SYSTEMS TO SUPPORT REACTIVE PROBLEM-SOLVING IN MANUFACTURING [J].
BALAKRISHNAN, A ;
KALAKOTA, R ;
OW, PS ;
WHINSTON, AB .
INTERNATIONAL JOURNAL OF PRODUCTION ECONOMICS, 1995, 38 (01) :31-58
[8]   TIME-PHASED RESOURCE-ALLOCATION FOR A PRODUCTION DISTRIBUTION-SYSTEM [J].
CARLSON, JG .
ENGINEERING COSTS AND PRODUCTION ECONOMICS, 1982, 6 (APR) :53-58
[9]   A contingent plan for disaster response [J].
Chakravarty, Amiya K. .
INTERNATIONAL JOURNAL OF PRODUCTION ECONOMICS, 2011, 134 (01) :3-15
[10]  
Clark K.B., 1991, PRODUCT DEV PERFORMA