Investigating the Strategic Planning of BIM Adoption on Construction Projects in a Developing Country

被引:4
作者
Olugboyega, Oluseye [1 ]
Windapo, Abimbola [2 ]
机构
[1] Obafemi Awolowo Univ, Fac Environm Design & Management, Dept Bldg, Ife, Nigeria
[2] Univ Cape Town, Fac Engn & Built Environm, Dept Construct Econ & Management, Cape Town, South Africa
关键词
BIM; BIM adoption; Strategic planning; BIM adoption framework; BIM execution plan; RISK PATHS; MANAGEMENT; FRAMEWORK; TECHNOLOGY; CHALLENGES; DESIGN;
D O I
10.21315/jcdc-02-21-0031
中图分类号
TU [建筑科学];
学科分类号
0813 ;
摘要
Strategic planning of building information modelling (BIM) adoption has become increasingly important, owing to the need to minimise BIM adoption risks, maximise BIM benefits and ensure successful BIM adoption. Our understanding of strategic planning of BIM adoption in a developing country is limited. Therefore, this study develops a framework for strategic BIM adoption on construction projects. The applicability of the framework was tested by using it to analyse the pattern of BIM adoption on construction projects in South Africa. The findings of the study demonstrate interrelationships between project milestones and deadlines, the extent of use of BIM software platforms used for the BIM-based construction projects (BBCPs) and the extent of collaboration on the BBCPs. The findings also confirm interrelationships between the regulatory system, the extent of use of BIM software platforms, the extent of collaboration and the extent of integration on the BBCPs. This research has shown that the strategic planning of BIM adoption enables the proper management of BIM tools and processes. The research has also provided practical guidelines for strategic planning of BIM adoption in developing countries.
引用
收藏
页码:183 / 204
页数:22
相关论文
共 55 条
[1]  
Ahmad-Latiffi A., 2013, International Journal of Construction Engineering and Management, V2, P1, DOI DOI 10.5923/S.IJCEM.201309.01
[2]   IT-enhanced communication protocols for building project management [J].
Ahuja, Vanita ;
Yang, Jay ;
Shankar, Ravi .
ENGINEERING CONSTRUCTION AND ARCHITECTURAL MANAGEMENT, 2010, 17 (02) :159-+
[3]  
[Anonymous], 2012, PROCS 4 W AFRICA BUI
[4]  
Baiden B. K., 2006, International Journal of Project Management, V24, P13, DOI 10.1016/j.ijproman.2005.05.001
[5]   Experience of Industry Case Studies: A Comparison of Multi-Case and Embedded Case Study Methods [J].
Bass, Julian M. ;
Beecham, Sarah ;
Noll, John .
2018 IEEE/ACM 6TH INTERNATIONAL WORKSHOP ON CONDUCTING EMPIRICAL STUDIES IN INDUSTRY (CESI), 2018, :13-20
[6]  
Bloomberg M.R., 2012, BIM GUIDELINES, P1
[7]  
Brockmann Christian., 2007, CIB WORLD BUILD C, P219
[8]   Analysis of BIM use for asset management in three public organizations in Quebec, Canada [J].
Brunet, Maude ;
Motamedi, Ali ;
Guenette, Louis-Martin ;
Forgues, Daniel .
BUILT ENVIRONMENT PROJECT AND ASSET MANAGEMENT, 2019, 9 (01) :153-167
[9]   Practices and effectiveness of building information modelling in construction projects in China [J].
Cao, Dongping ;
Wang, Guangbin ;
Li, Heng ;
Skitmore, Martin ;
Huang, Ting ;
Zhang, Weiyu .
AUTOMATION IN CONSTRUCTION, 2015, 49 :113-122
[10]   A Hybrid MCDM Technique for Risk Management in Construction Projects [J].
Chatterjee, Kajal ;
Zavadskas, Edmundas Kazimieras ;
Tamosaitiene, Jolanta ;
Adhikary, Krishnendu ;
Kar, Samarjit .
SYMMETRY-BASEL, 2018, 10 (02)