Scheduling Cluster Tools With Ready Time Constraints for Consecutive Small Lots

被引:93
作者
Kim, Hyun-Jung [1 ]
Lee, Jun-Ho [1 ]
Jung, Chihyun [2 ]
Lee, Tae-Eog [1 ]
机构
[1] Korea Adv Inst Sci & Technol, Dept Ind & Syst Engn, Taejon 305701, South Korea
[2] GlobalFoundries Inc, Milpitas, CA 95035 USA
基金
新加坡国家研究基金会;
关键词
Cluster tool; noncyclic scheduling; Petri net; ready time constraints; small lot production; STEADY-STATE THROUGHPUT; PETRI NETS; MULTICLUSTER TOOLS; EVENT GRAPH; SCHEDULABILITY; HOIST;
D O I
10.1109/TASE.2012.2220355
中图分类号
TP [自动化技术、计算机技术];
学科分类号
0812 ;
摘要
In the semiconductor manufacturing industry, the lot size currently tends to be extremely small, even being only 5-8 wafers, whereas conventional lots have 25 identical wafers. The smaller lot size is made because customers demand extremely small lots, and the number of chips in a large 300 mm wafer has increased. Cyclic scheduling is not applicable for such small lot production because the number of identical work cycles accounts for a small proportion of scheduling as compared to the lengths of the starting and closing transient periods. We therefore examine a new noncyclic scheduling problem of cluster tools for small lot production that considers ready time constraints on the chambers and the robot. The ready times are the epochs when the resources are freed from processing the preceding lot. To solve the scheduling problem, we develop a Petri net model which is a graphical and mathematical method for discrete event dynamic systems. Based on the Petri net model, we also develop a mixed integer programming (MIP) model and a branch and bound (B&B) algorithm for determining an optimal schedule. The B&B algorithm solves lots with up to 25 wafers and eight wafers within 500 s for a single-armed cluster tool and a dual-armed cluster tool, respectively, when three process steps are considered. Therefore, we propose an approximation method for the dual-armed cluster tool that schedules only the first few wafers with the B&B algorithm and the succeeding wafers with a well-known cyclic sequence. From experiments, we conclude that the difference between the approximation method and an optimal makespan is less than 1%. The methods we propose can be used for general noncyclic scheduling problems that can be modeled by Petri nets.
引用
收藏
页码:145 / 159
页数:15
相关论文
共 39 条
[1]  
Baccelli F., 1992, SYNCHRONIZATION LINE, P53
[2]   Optimal Scheduling of Multicluster Tools With Constant Robot Moving Times, Part I: Two-Cluster Analysis [J].
Chan, Wai Kin Victor ;
Yi, Jingang ;
Ding, Shengwei .
IEEE TRANSACTIONS ON AUTOMATION SCIENCE AND ENGINEERING, 2011, 8 (01) :5-16
[3]   Optimal Scheduling of Multicluster Tools With Constant Robot Moving Times, Part II: Tree-Like Topology Configurations [J].
Chan, Wai Kin Victor ;
Ding, Shengwei ;
Yi, Jingang ;
Song, Dezhen .
IEEE TRANSACTIONS ON AUTOMATION SCIENCE AND ENGINEERING, 2011, 8 (01) :17-28
[4]   Cyclic hoist scheduling in large real-life electroplating lines [J].
Che, Ada ;
Chu, Chengbin .
OR SPECTRUM, 2007, 29 (03) :445-470
[5]   Optimal cyclic scheduling of a hoist and multi-type parts with fixed processing times [J].
Che, Ada ;
Yan, Pengyu ;
Yang, Naiding ;
Chu, Chengbin .
INTERNATIONAL JOURNAL OF PRODUCTION RESEARCH, 2010, 48 (05) :1225-1243
[6]  
Choi W.-S., 2010, THESIS KOREA ADV I S
[7]   Cyclic scheduling in robotic flowshops [J].
Crama, Y ;
Kats, V ;
van de Klundert, J ;
Levner, E .
ANNALS OF OPERATIONS RESEARCH, 2000, 96 (1-4) :97-124
[8]   PETRI NETS FOR MODELING OF DYNAMIC-SYSTEMS - A SURVEY [J].
DAVID, R ;
ALLA, H .
AUTOMATICA, 1994, 30 (02) :175-202
[9]   Throughput optimization in dual-gripper interval robotic cells [J].
Dawande, Milind ;
Geismar, H. Neil ;
Pinedo, Michael ;
Sriskandarajah, Chelliah .
IIE TRANSACTIONS, 2010, 42 (01) :1-15
[10]   Dominance of cyclic solutions and challenges in the scheduling of robotic cells [J].
Dawande, MW ;
Geismar, HN ;
Sethi, SP .
SIAM REVIEW, 2005, 47 (04) :709-721