Multi-Variant Scheduling of Critical Time-Triggered Communication in Incremental Development Process: Application to FlexRay

被引:4
作者
Dvorak, Jan [1 ,2 ]
Hanzalek, Zdenek [2 ]
机构
[1] Czech Tech Univ, Fac Elect Engn, Dept Control Engn, Prague 16000, Czech Republic
[2] Czech Tech Univ, Czech Inst Informat Robot & Cybernet, Ind Informat Res Ctr, Prague 16000, Czech Republic
基金
欧盟地平线“2020”;
关键词
FlexRay; static segment; automotive; scheduling; incremental; multi-variant; real-time;
D O I
10.1109/TVT.2018.2879920
中图分类号
TM [电工技术]; TN [电子技术、通信技术];
学科分类号
0808 ; 0809 ;
摘要
The portfolio of models offered by car manufacturing groups often includes many variants (i.e., different car models and their versions). With such diversity in car models, variant management becomes a formidable task. Thus, there is an effort to keep the variants as close as possible. This simple requirement forms a big challenge in the area of communication protocols. When several vehicle variants use the same signal, it is often required to simultaneously schedule such a signal in all vehicle variants. Furthermore, new vehicle variants are designed incrementally in such a way as to maintain backward compatibility with the older vehicles. Backward compatibility of time-triggered schedules reduces expenses relating to testing and fine-tuning of the components that interact with physical environment (e.g., electromagnetic compatibility issues). As this requirement provides for using the same platform, it simplifies signal traceability and diagnostics, across different vehicle variants, besides simplifying the reuse of components and tools. This paper proposes an efficient and robust heuristic algorithm, which creates the schedules for internal communication of new vehicle variants. The algorithm provides for variant management by ensuring compatibility among the new variants, besides preserving backward compatibility with the preceding vehicle variants. The proposed method can save about 20% of the bandwidth with respect to the schedule common to all variants. Based on the results of the proposed algorithm, the impact of maintaining compatibility among new variants and of preserving backward compatibility with the preceding variants on the scheduling procedure is examined and discussed. Thanks to the execution time of the algorithm, which is less than one second, the network parameters like the frame length and cycle duration are explored to find their best choice concerning the schedule feasibility. Finally, the algorithm is tested on benchmark sets.
引用
收藏
页码:155 / 169
页数:15
相关论文
共 33 条
[1]  
[Anonymous], 17458 ISO
[2]  
Association for Standardisation of Automation and Measuring Systems, 2014, ASAM MCD 2 NET STAND
[3]  
AUTOSAR Development Partnership, 2013, AUTOSAR SPECIFICATIO
[4]  
AUTOSAR Development Partnership, 2013, AUTOSAR REQUIREMENTS
[5]   Variant-oriented assembly planning [J].
Bley, H. ;
Zenner, C. .
CIRP ANNALS-MANUFACTURING TECHNOLOGY, 2006, 55 (01) :23-28
[6]  
BRAUN C, 2007, P 7 IFAC INT C FIELD, P321
[7]  
Buiga A., 2012, International Journal of Academic Research in Business and Social Sciences2, P391
[8]   Scheduling Real-Time Communication in IEEE 802.1Qbv Time Sensitive Networks [J].
Craciunas, Silviu S. ;
Oliver, Ramon Serna ;
Chmelik, Martin ;
Steiner, Wilfried .
PROCEEDINGS OF THE 24TH INTERNATIONAL CONFERENCE ON REAL-TIME NETWORKS AND SYSTEMS PROCEEDINGS (RTNS 2016), 2016, :183-192
[9]   Reliability Evaluation of Broadcast Protocols for FlexRay [J].
do Souto, Pedro Ferreira ;
Portugal, Paulo ;
Vasques, Francisco .
IEEE TRANSACTIONS ON VEHICULAR TECHNOLOGY, 2016, 65 (02) :525-541
[10]  
Dvorak J., 2018, Incremental Multi-Variant Flexray Static Segment Scheduler