Application of an evolutionary algorithm-based ensemble model to job-shop scheduling

被引:19
作者
Tan, Choo Jun [1 ]
Neoh, Siew Chin [2 ]
Lim, Chee Peng [3 ]
Hanoun, Samer [3 ]
Wong, Wai Peng [4 ]
Loo, Chu Kong [5 ]
Zhang, Li [6 ]
Nahavandi, Saeid [3 ]
机构
[1] Wawasan Open Univ, Sch Sci & Technol, George Town, Malaysia
[2] UCSI Univ, Fac Engn Technol & Built Environm, Kuala Lumpur, Malaysia
[3] Deakin Univ, Inst Intelligent Syst Res & Innovat, Geelong, Vic, Australia
[4] Univ Sci Malaysia, Sch Management, George Town, Malaysia
[5] Univ Malaya, Fac Comp Sci & Informat Technol, Dept Artificial Intelligence, Kuala Lumpur, Malaysia
[6] Northumbria Univ, Dept Comp Sci & Digital Technol, Fac Engn & Environm, Newcastle Upon Tyne, Tyne & Wear, England
关键词
Multi-objective optimisation; Evolutionary algorithm; Ensemble model; Job-shop scheduling; MULTIOBJECTIVE GENETIC ALGORITHM; OPTIMIZATION; FLOWSHOP; FRAMEWORK; PARAMETERS; OPTIMALITY; MULTIPLE; SUPPORT; SEARCH; DESIGN;
D O I
10.1007/s10845-016-1291-1
中图分类号
TP18 [人工智能理论];
学科分类号
081104 ; 0812 ; 0835 ; 1405 ;
摘要
In this paper, a novel evolutionary algorithm is applied to tackle job-shop scheduling tasks in manufacturing environments. Specifically, a modified micro genetic algorithm (MmGA) is used as the building block to formulate an ensemble model to undertake multi-objective optimisation problems in job-shop scheduling. The MmGA ensemble is able to approximate the optimal solution under the Pareto optimality principle. To evaluate the effectiveness of the MmGA ensemble, a case study based on real requirements is conducted. The results positively indicate the effectiveness of the MmGA ensemble in undertaking job-shop scheduling problems.
引用
收藏
页码:879 / 890
页数:12
相关论文
共 79 条
  • [1] Abu-Lebdeh G., 1999, Computer-Aided Civil and Infrastructure Engineering, V14, P321, DOI 10.1111/0885-9507.00151
  • [2] Augmented ε-constraint method in multi-objective flowshop problem with past sequence set-up times and a modified learning effect
    Amirian, Homa
    Sahraeian, Rashed
    [J]. INTERNATIONAL JOURNAL OF PRODUCTION RESEARCH, 2015, 53 (19) : 5962 - 5976
  • [3] [Anonymous], 2014, Manual of Political Economy: A Variorum Translation and Critical Edition
  • [4] [Anonymous], 2012, P 17 IEEE C EM TECHN
  • [5] Towards a distributed multi-agent framework for shared resources scheduling
    Archimede, Bernard
    Letouzey, Agnes
    Memon, Muhammad Ali
    Xu, Jiucheng
    [J]. JOURNAL OF INTELLIGENT MANUFACTURING, 2014, 25 (05) : 1077 - 1087
  • [6] Back T., 1997, IEEE Transactions on Evolutionary Computation, V1, P3, DOI 10.1109/4235.585888
  • [7] An Overview of Evolutionary Algorithms for Parameter Optimization
    Baeck, Thomas
    Schwefel, Hans-Paul
    [J]. EVOLUTIONARY COMPUTATION, 1993, 1 (01) : 1 - 23
  • [8] Automated design of ligands to polypharmacological profiles
    Besnard, Jeremy
    Ruda, Gian Filippo
    Setola, Vincent
    Abecassis, Keren
    Rodriguiz, Ramona M.
    Huang, Xi-Ping
    Norval, Suzanne
    Sassano, Maria F.
    Shin, Antony I.
    Webster, Lauren A.
    Simeons, Frederick R. C.
    Stojanovski, Laste
    Prat, Annik
    Seidah, Nabil G.
    Constam, Daniel B.
    Bickerton, G. Richard
    Read, Kevin D.
    Wetsel, William C.
    Gilbert, Ian H.
    Roth, Bryan L.
    Hopkins, Andrew L.
    [J]. NATURE, 2012, 492 (7428) : 215 - +
  • [9] A research survey: review of AI solution strategies of job shop scheduling problem
    Calis, Banu
    Bulkan, Serol
    [J]. JOURNAL OF INTELLIGENT MANUFACTURING, 2015, 26 (05) : 961 - 973
  • [10] Multiobjective Evolutionary Optimization of Batch Process Scheduling Under Environmental and Economic Concerns
    Capon-Garcia, Elisabet
    Bojarski, Aaron D.
    Espuna, Antonio
    Puigjaner, Luis
    [J]. AICHE JOURNAL, 2013, 59 (02) : 429 - 444