Multiobjective memetic algorithms for time and space assembly line balancing

被引:27
作者
Chica, Manuel [1 ]
Cordon, Oscar [1 ,2 ]
Damas, Sergio [1 ]
Bautista, Joaquin [3 ]
机构
[1] European Ctr Soft Comp, Mieres 33600, Spain
[2] ETS Informat & Telecomunicac, Dept Comp Sci & Artificial Intelligence, Granada 18071, Spain
[3] Univ Politecn Cataluna, Nissan Chair ETSEIB, E-08028 Barcelona, Spain
关键词
Time and space assembly line balancing problem; Automotive industry; Multiobjective optimisation; Memetic algorithms; NSGA-II; Ant colony optimisation; GRASP; Local search; LOCAL SEARCH; EVOLUTIONARY ALGORITHMS; GENETIC ALGORITHM; 1/3; VARIANT; DESIGN;
D O I
10.1016/j.engappai.2011.05.001
中图分类号
TP [自动化技术、计算机技术];
学科分类号
0812 ;
摘要
This paper presents three proposals of multiobjective memetic algorithms to solve a more realistic extension of a classical industrial problem: time and space assembly line balancing. These three proposals are, respectively, based on evolutionary computation, ant colony optimisation, and greedy randomised search procedure. Different variants of these memetic algorithms have been developed and compared in order to determine the most suitable intensification-diversification trade-off for the memetic search process. Once a preliminary study on nine well-known problem instances is accomplished with a very good performance, the proposed memetic algorithms are applied considering real-world data from a Nissan plant in Barcelona (Spain). Outstanding approximations to the pseudo-optimal non-dominated solution set were achieved for this industrial case study. (C) 2011 Elsevier Ltd. All rights reserved.
引用
收藏
页码:254 / 273
页数:20
相关论文
共 50 条
[41]   An efficient approach for type II robotic assembly line balancing problems [J].
Gao, Jie ;
Sun, Linyan ;
Wang, Lihua ;
Gen, Mitsuo .
COMPUTERS & INDUSTRIAL ENGINEERING, 2009, 56 (03) :1065-1080
[42]   A multiobjective hybrid imperialist competitive algorithm for multirobot cooperative assembly line balancing problems with energy awareness [J].
Zhou, Bing-hai ;
Kang, Xue-yun .
PROCEEDINGS OF THE INSTITUTION OF MECHANICAL ENGINEERS PART C-JOURNAL OF MECHANICAL ENGINEERING SCIENCE, 2019, 233 (09) :2991-3003
[43]   The robotic assembly line balancing problem under task time uncertainty [J].
Zacharia, Paraskevi ;
Nearchou, Andreas C. .
INTERNATIONAL JOURNAL OF ADVANCED MANUFACTURING TECHNOLOGY, 2025, 137 (5-6) :2991-3011
[44]   Fitness landscape analysis of the simple assembly line balancing problem type 1 [J].
Ghandi, Somaye ;
Masehian, Ellips .
INTERNATIONAL JOURNAL OF INDUSTRIAL ENGINEERING COMPUTATIONS, 2023, 14 (04) :589-608
[45]   Variable-depth local search heuristic for assembly line balancing problems [J].
Alvarez-Miranda, Eduardo ;
Pereira, Jordi ;
Vargas, Camila ;
Vila, Mariona .
INTERNATIONAL JOURNAL OF PRODUCTION RESEARCH, 2023, 61 (09) :3102-3120
[46]   Research Trends and Outlooks in Assembly Line Balancing Problems [J].
Chutima, Parames .
ENGINEERING JOURNAL-THAILAND, 2020, 24 (05) :93-134
[47]   One-Machine Scheduling with Time-Dependent Capacity via Efficient Memetic Algorithms [J].
Mencia, Raul ;
Mencia, Carlos .
MATHEMATICS, 2021, 9 (23)
[48]   An investigation of mixed-model assembly line balancing problem with uncertain assembly time in remanufacturing [J].
Liu, Qingtao ;
Wei, Xinji ;
Wang, Qi ;
Song, Jiayao ;
Lv, Jingxiang ;
Liu, Ying ;
Tang, Ou .
COMPUTERS & INDUSTRIAL ENGINEERING, 2024, 198
[49]   Heuristic algorithms for a delivery workload balancing problem in an assembly plant [J].
Karuno, Yoshiyuki ;
Furukawa, Kento .
JOURNAL OF ADVANCED MECHANICAL DESIGN SYSTEMS AND MANUFACTURING, 2016, 10 (04)
[50]   Solving a new cost-oriented assembly line balancing problem by classical and hybrid meta-heuristic algorithms [J].
Salehi, Maryam ;
Maleki, Hamid Reza ;
Niroomand, Sadegh .
NEURAL COMPUTING & APPLICATIONS, 2020, 32 (12) :8217-8243