Evolutionary generation of dispatching rule sets for complex dynamic scheduling problems

被引:114
作者
Pickardt, Christoph W. [1 ]
Hildebrandt, Torsten [2 ]
Branke, Juergen [1 ]
Heger, Jens [2 ]
Scholz-Reiter, Bernd [2 ]
机构
[1] Univ Warwick, Warwick Business Sch, Coventry CV4 7AL, W Midlands, England
[2] BIBA Bremen Inst Prod & Logist, D-28359 Bremen, Germany
关键词
Hyper-heuristics; Dispatching rules; Production scheduling; Semiconductor manufacturing; Evolutionary algorithms; Genetic programming; TOTAL WEIGHTED TARDINESS; JOB-SHOP; PERFORMANCE EVALUATION; HEURISTICS; SIMULATION; DISCOVERY; SELECTION; MINIMIZE;
D O I
10.1016/j.ijpe.2012.10.016
中图分类号
T [工业技术];
学科分类号
08 ;
摘要
We propose a two-stage hyper-heuristic for the generation of a set of work centre-specific dispatching rules. The approach combines a genetic programming (GP) algorithm that evolves a composite rule from basic job attributes with an evolutionary algorithm (EA) that searches for a good assignment of rules to work centres. The hyper-heuristic is tested against its two components and rules from the literature on a complex dynamic job shop problem from semiconductor manufacturing. Results show that all three hyper-heuristics are able to generate (sets of) rules that achieve a significantly lower mean weighted tardiness than any of the benckmark rules. Moreover, the two-stage approach proves to outperform the GP and EA hyper-heuristic as it optimises on two different heuristic search spaces that appear to tap different optimisation potentials. The resulting rule sets are also robust to most changes in the operating conditions. (C) 2012 Elsevier B.V. All rights reserved.
引用
收藏
页码:67 / 77
页数:11
相关论文
共 60 条
[1]  
[Anonymous], 2012, Scheduling
[2]  
Atlan L., 1994, P 7 ANN FLOR ART INT
[3]   Executing production schedules in the face of uncertainties: A review and some future directions [J].
Aytug, H ;
Lawley, MA ;
McKay, K ;
Mohan, S ;
Uzsoy, R .
EUROPEAN JOURNAL OF OPERATIONAL RESEARCH, 2005, 161 (01) :86-110
[4]   A spatial rule adaptation procedure for reliable production control in a wafer fabrication system [J].
Baek, DH ;
Yoon, WC ;
Park, SC .
INTERNATIONAL JOURNAL OF PRODUCTION RESEARCH, 1998, 36 (06) :1475-1491
[5]   Co-evolutionary genetic algorithm for multi-machine scheduling: coping with high performance variability [J].
Baek, DH ;
Yoon, WC .
INTERNATIONAL JOURNAL OF PRODUCTION RESEARCH, 2002, 40 (01) :239-254
[6]  
Baker K.R., 1983, J OPER MANAG, V4, P11, DOI [10.1016/0272-6963(83)90022-0, DOI 10.1016/0272-6963(83)90022-0]
[7]  
Baker K.R., 1982, Journal of Operations Management, V3, P37, DOI [DOI 10.1016/0272-6963(82)90020-1, 10.1016/0272-6963, DOI 10.1016/0272-6963]
[8]   Simple priority rule combinations: an approach to improve both flow time and tardiness [J].
Barman, S .
INTERNATIONAL JOURNAL OF PRODUCTION RESEARCH, 1997, 35 (10) :2857-2870
[9]   A STATE-OF-THE-ART SURVEY OF DISPATCHING RULES FOR MANUFACTURING JOB SHOP OPERATIONS [J].
BLACKSTONE, JH ;
PHILLIPS, DT ;
HOGG, GL .
INTERNATIONAL JOURNAL OF PRODUCTION RESEARCH, 1982, 20 (01) :27-45
[10]   Performance evaluation of family-based dispatching in small manufacturing cells [J].
Bokhorst, J. A. C. ;
Nomden, G. ;
Slomp, J. .
INTERNATIONAL JOURNAL OF PRODUCTION RESEARCH, 2008, 46 (22) :6305-6321