SCHEDULING PROBLEMS WITH A COMMON DUE WINDOW ASSIGNMENT: A SURVEY

被引:14
作者
Janiak, Adam [1 ]
Kwiatkowski, Tomasz [1 ]
Lichtenstein, Maciej [1 ]
机构
[1] Wroclaw Univ Technol, Inst Comp Engn Control & Robot, PL-50372 Wroclaw, Poland
关键词
scheduling; due window assignment; earliness/tardiness; practical example; TARDINESS PENALTIES; DUE-DATE; SINGLE; EARLINESS; TIME; EARLINESS/TARDINESS;
D O I
10.2478/amcs-2013-0018
中图分类号
TP [自动化技术、计算机技术];
学科分类号
0812 ;
摘要
In this article a survey of studies on scheduling problems with a common due window assignment and earliness/tardiness penalty functions is presented. A due window is a generalization of the classical due date and describes a time interval in which a job should be finished. If a job is completed before or after the due window, it incurs an earliness or a tardiness penalty, respectively. In this survey we separately analyse the classical models with job-independent and job-dependent earliness/tardiness penalty functions and some other more complicated models. We describe the computational complexity of the problems and the main features of the approaches developed to solve them. Particular attention is paid to practical applications of the analysed models. As turns out, some complicated models combining classical scheduling problems with, e.g., learning and aging effects have no reasonable practical justification in the literature.
引用
收藏
页码:231 / 241
页数:11
相关论文
共 52 条