An ANP Model for Risk Assessment in Large-Scale Transport Infrastructure Projects

被引:18
作者
Yucelgazi, Fikri [1 ]
Yitmen, Ibrahim [1 ]
机构
[1] Eastern Mediterranean Univ, Civil Engn Dept, Mersin 10, Gazimagusa, Kibris, Turkey
关键词
Large-scale; Transport; Infrastructure projects; ANP; Europe; Middle East; CONSTRUCTION; FRAMEWORK; TUNNEL;
D O I
10.1007/s13369-018-3314-z
中图分类号
O [数理科学和化学]; P [天文学、地球科学]; Q [生物科学]; N [自然科学总论];
学科分类号
07 ; 0710 ; 09 ;
摘要
Large-scale transport infrastructure projects (LSTIPs) are developed structures that emerged from the essential necessity of fast-paced and convenient transportation in gradually growing populations. Multiple risks, such as technical, financial, economic, political, construction, managerial, natural and environmental and legal risks, may be encountered in LSTIPs. This study aims to list these possible risks in order of priority for European and Middle Eastern LSTIPs by means of an analytical network process method. The priority orders were obtained separately for Europe and the Middle East, and comparisons were made between these regions. The results highlight that Europe and the Middle East share both common and distinctive risk factors in the orders of priority. "The financial strength of the client" ranked as the foremost common risk factor for Europe and the Middle East received a priority value of 13.37 and 11.54%, respectively. However, salient differences in the findings revealed that "change in scope of work" and "water pollution" ranked as the second leading risk factors have priority values of 5.48% for Europe and 4.55% for the Middle East, respectively. To further support the priority orders achieved in this study, two different case studies were conducted. The priority orders achieved in this study could be used as a guideline for identifying and sequencing the risks in planning stages of similar projects conducted in various countries. Future related studies could be juxtaposed with the results of this study to analyse the alterations of priority orders that will have occurred in the course of time.
引用
收藏
页码:4257 / 4275
页数:19
相关论文
共 65 条
[1]  
ABDOLLAHZADEH G, 2015, ENG SYST, V1
[2]  
Al-Sabah R., 2012, P CIB W78 29 INT C B
[3]   Evaluating impact of construction risks in the Arabian Gulf Region from perspective of multinational architecture, engineering and construction firms [J].
Al-Sabah, Ruqaya ;
Menassa, Carol C. ;
Hanna, Awad .
CONSTRUCTION MANAGEMENT AND ECONOMICS, 2014, 32 (04) :382-402
[4]   Railway risk assessment - the fuzzy reasoning approach and fuzzy analytic hierarchy process approaches: a case study of shunting at Waterloo depot [J].
An, M. ;
Huang, S. ;
Baker, C. J. .
PROCEEDINGS OF THE INSTITUTION OF MECHANICAL ENGINEERS PART F-JOURNAL OF RAIL AND RAPID TRANSIT, 2007, 221 (03) :365-383
[5]  
[Anonymous], 2007, CALTR PROJ RISK MAN
[6]  
[Anonymous], 2000, GUID PROJ MAN BOD KN
[7]  
[Anonymous], 2011, TREATM UNC MOD FOR
[8]  
[Anonymous], 2010, UCL PROJ PROF NETH H
[9]  
[Anonymous], 2011, T EUR TRANSP NETW NE
[10]   Causes of delay in large construction projects [J].
Construction Engineering and Management Department, King Fahd University of Petroleum and Minerals, Box # 680, Dhahran, 31261, Saudi Arabia .
Int. J. Proj. Manage., 2006, 4 (349-357) :349-357