Calculation for settlement of high cap extra-long large diameter pile groups

被引:2
|
作者
Deng, Yousheng [1 ]
Zheng, Jianqiang [1 ]
Wan, Changzhong [1 ]
He, Shaohua [1 ]
机构
[1] Hubei Univ Technol, Sch Civil Engn & Architecture, Wuhan 430068, Peoples R China
关键词
extra-long large diameter pile groups; high cap; ratio of pile end resistance to pile top load; pile compression; settlement;
D O I
10.4028/www.scientific.net/AMM.178-181.2171
中图分类号
TU [建筑科学];
学科分类号
0813 ;
摘要
The settlement of high cap extra-long large diameter pile groups is made up of pile elastic compression and settlement of soil layers under pile end in theory. Methods to calculate pile compression of high cap extra-long large diameter pile groups was deduced or listed. Six methods to calculate settlement of soil layers under pile end were expounded through extra-long large diameter pile groups under south tower of main bridge of Sutong Yangtse River Highway Bridges. The results show that piles' elastic compression should be calculated into the settlement of extra-long large diameter pile groups, including that caused by pile's own weight, and it is little difference between test value and total settlement which is composed of piles' elastic compression calculated through the formula deduced in the paper and theoretic settlement of soil layers under pile end based on Mindlin's additional stress solution, only making 0.06% lower.
引用
收藏
页码:2171 / 2174
页数:4
相关论文
共 50 条
  • [21] Response of laterally loaded large-diameter bored pile groups
    Ng, CWW
    Zhang, LM
    Nip, DCN
    JOURNAL OF GEOTECHNICAL AND GEOENVIRONMENTAL ENGINEERING, 2001, 127 (08) : 658 - 669
  • [22] Research on Dynamic Pile-Driving Formula Parameters and Driving Feasibility of Extra-Long PHC Pipe Piles
    Liu, Xiaomin
    Xiao, Yonggang
    Zhou, Junlong
    Ge, Longbo
    Song, Ziwen
    BUILDINGS, 2023, 13 (05)
  • [23] Temperature reduction for extra-long railway tunnel with high geotemperature by longitudinal ventilation
    Zeng, Yanhua
    Tao, Liangliang
    Ye, Xuqian
    Zhou, Xiaohan
    Fang, Yong
    Fan, Lei
    Liu, Xinrong
    Yang, Zongxian
    TUNNELLING AND UNDERGROUND SPACE TECHNOLOGY, 2020, 99
  • [24] Temperature reduction for extra-long railway tunnel with high geotemperature by longitudinal ventilation
    Zeng Y.
    Tao L.
    Ye X.
    Zhou X.
    Fang Y.
    Fan L.
    Liu X.
    Yang Z.
    Tunnelling and Underground Space Technology, 2020, 99
  • [25] Settlement Prediction Method of Extra-Large Diameter Tunnels in Soft Rock Strata
    Zhou, Jianguang
    Qiu, Decai
    Sun, Shangqu
    Zhou, Heng
    Chen, Diyang
    Chen, Hao
    Hu, Huijiang
    Hu, Huanchun
    ADVANCES IN CIVIL ENGINEERING, 2023, 2023
  • [26] Efficient machine learning model for settlement prediction of large diameter helical pile in c—Φ soil
    Nur Mohammad Shuman
    Mohammad Sadik Khan
    Farshad Amini
    AI in Civil Engineering, 2024, 3 (1):
  • [27] Study on refusal of restarting of large diameter and deep penetration pile and bearing capacity calculation
    Liu, Run
    Yan, Yue
    Yan, Shuwang
    Yanshilixue Yu Gongcheng Xuebao/Chinese Journal of Rock Mechanics and Engineering, 2008, 27 (SUPPL. 2): : 3459 - 3464
  • [28] Large scale model tests on settlement characteristics of long pile group foundation
    Qiu, Rendong
    Liu, Jinli
    Gao, Wensheng
    Qiu, Mingbing
    Tumu Gongcheng Xuebao/China Civil Engineering Journal, 2015, 48 (03): : 85 - 95
  • [29] A Novel Insertion Technique for the Extra-Long Montgomery T-Tube in Patients with a Large Mediastinal Tumor
    Kato, Tatsuya
    Fujiwara-Kuroda, Aki
    Shiina, Nobuyuki
    Aragaki, Masato
    Ujiie, Hideki
    Hida, Yasuhiro
    Kaga, Kichizo
    ANNALS OF THORACIC AND CARDIOVASCULAR SURGERY, 2020, 26 (05) : 294 - 297
  • [30] Influence of modelling boundaries on behaviour of pile groups with dumbbell shaped pile-cap supporting for a super large bridge
    Geotechnical Engineering Department, Nanjing Hydraulic Research Institute, Nanjing 210024, China
    Yantu Gongcheng Xuebao, 2007, 2 (260-267):