Calculation for settlement of high cap extra-long large diameter pile groups

被引:2
作者
Deng, Yousheng [1 ]
Zheng, Jianqiang [1 ]
Wan, Changzhong [1 ]
He, Shaohua [1 ]
机构
[1] Hubei Univ Technol, Sch Civil Engn & Architecture, Wuhan 430068, Peoples R China
来源
SUSTAINABLE ENVIRONMENT AND TRANSPORTATION, PTS 1-4 | 2012年 / 178-181卷
关键词
extra-long large diameter pile groups; high cap; ratio of pile end resistance to pile top load; pile compression; settlement;
D O I
10.4028/www.scientific.net/AMM.178-181.2171
中图分类号
TU [建筑科学];
学科分类号
0813 ;
摘要
The settlement of high cap extra-long large diameter pile groups is made up of pile elastic compression and settlement of soil layers under pile end in theory. Methods to calculate pile compression of high cap extra-long large diameter pile groups was deduced or listed. Six methods to calculate settlement of soil layers under pile end were expounded through extra-long large diameter pile groups under south tower of main bridge of Sutong Yangtse River Highway Bridges. The results show that piles' elastic compression should be calculated into the settlement of extra-long large diameter pile groups, including that caused by pile's own weight, and it is little difference between test value and total settlement which is composed of piles' elastic compression calculated through the formula deduced in the paper and theoretic settlement of soil layers under pile end based on Mindlin's additional stress solution, only making 0.06% lower.
引用
收藏
页码:2171 / 2174
页数:4
相关论文
共 9 条
  • [1] AASHTO, 1998, AM HIGHW BRIDG COD L, P669
  • [2] [Anonymous], 2005, TB1000252005, P8
  • [3] [Anonymous], 2002, GB500072002 CHIN AC, P27
  • [4] [Anonymous], FHWA PUBLICATION
  • [5] [Anonymous], 2008, 942008 JGJ CHIN AC B, P1
  • [6] [Anonymous], 2007, D0632007 JTG CHIN HI, P1
  • [7] China Second Harbor Consultants Ltd, 2003, ENG GEOL SURV FIN RE, P10
  • [8] Deng Yousheng, 2005, RES EFFECT COEFFICIE, P1
  • [9] Gong Weiming, 2003, ENG GEOLOGICAL REPOR, P1