共 40 条
[21]
*NEW S WAL WORKC A, WHAT AR MY MAIN OCC
[22]
RISK AND ITS MANAGEMENT IN CONSTRUCTION PROJECTS
[J].
PROCEEDINGS OF THE INSTITUTION OF CIVIL ENGINEERS PART 1-DESIGN AND CONSTRUCTION,
1985, 78 (JUN)
:499-521
[23]
Saaty T.L., 1982, DECISION MAKING LEAD
[24]
Saaty T.L., 1980, The analytic hierarchy process, DOI DOI 10.21236/ADA214804
[25]
SHANG C, 2006, P INT COUNC RES INN, P3
[26]
EVALUATION OF ADVANCED CONSTRUCTION TECHNOLOGY WITH AHP METHOD
[J].
JOURNAL OF CONSTRUCTION ENGINEERING AND MANAGEMENT-ASCE,
1992, 118 (03)
:577-593
[27]
Smith N., 2006, Managing risk in construction projects
[28]
Contractor project risks contingency allocation using linguistic approximation
[J].
Computing Systems in Engineering: An International Journal,
1993, 4 (2-3)
[29]
Tah J.H.M., 2000, CONSTRUCTION MANAGEM, V18, P491, DOI [10.1080/01446190050024905, DOI 10.1080/01446190050024905]