Resource Leveling in Projects with Stochastic Minimum Time Lags

被引:18
|
作者
Li, Hongbo [1 ]
Wang, Meng [2 ,3 ]
Dong, Xuebing [1 ]
机构
[1] Shanghai Univ, Sch Management, Shanghai 200444, Peoples R China
[2] Shanghai Univ Finance & Econ, Sch Informat Management & Engn, Shanghai 200433, Peoples R China
[3] Shanghai Lixin Univ Accounting & Finance, Off Acad Affairs, Shanghai 201209, Peoples R China
基金
美国国家科学基金会;
关键词
Project management; Project scheduling; Resource leveling; Scheduling strategies; Time uncertainty; Metaheuristics; HEURISTIC PROCEDURES; GENETIC ALGORITHM; CONSTRUCTION; OPTIMIZATION;
D O I
10.1061/(ASCE)CO.1943-7862.0001635
中图分类号
TU [建筑科学];
学科分类号
0813 ;
摘要
In project management, resources and time are two critical aspects influencing the success of a project. On the one hand, resource leveling, an effective resource optimization technique, is widely adopted to guarantee the efficient use of resources. On the other hand, to deliver a project as soon as possible, it can typically be accelerated by overlapping some activities. In a real-life project environment, uncertainty is inevitable and further complicates resource leveling and activity overlapping. However, existing research tends to study resource leveling and activity overlapping separately and little attention has been paid to level resource usage with uncertain activity overlapping. Therefore, the authors model activity overlaps as minimum time lags and study the resource leveling problem with stochastic minimum time lags (RLP-SMTL), where both the time lags and the activity durations are uncertain. This study aims to obtain a scheduling strategy such that the usage of renewable resources is as smooth as possible over time. The tuple represented by a random key vector, a strategy dynamically schedules activities at each decision point. A simulation-based solution framework for the RLP-SMTL is proposed. Built upon the proposed solution framework, two metaheuristics, an evolutionary algorithm (EA) and a bat algorithm (BA), are designed. Based on 1,080 randomly generated 100-activity instances, extensive computational experiments are performed to evaluate the effectiveness of the proposed algorithms. The results reveal that the EA outperforms the BA in terms of both the objective function's value and the timely project completion probability. Although the strategies generated by the BA are slightly weaker than the EA, the BA is much faster than the EA. The results obtained by an additional comparison experiment further show that the proposed algorithms outperform the existing best-performing metaheuristic. Additionally, an example project is adopted to illustrate how the proposed approach can be applied to practical resource leveling in construction projects. In conclusion, this paper contributes to the body of knowledge in construction engineering and management by developing effective metaheuristics that equip the project manager with an automated tool to make effective resource leveling decisions under uncertainties. (C) 2019 American Society of Civil Engineers.
引用
收藏
页数:13
相关论文
共 50 条
  • [1] Stochastic resource leveling in projects with flexible structures
    Li, Hongbo
    Zheng, Linwen
    Chen, Rui
    Zhang, Xianchao
    COMPUTERS & OPERATIONS RESEARCH, 2024, 169
  • [2] PREEMPTIVE RESOURCE LEVELING IN PROJECTS
    Li, Hongbo
    Hu, Ziyi
    Zhu, Hanyu
    Liu, Yinbin
    ECONOMIC COMPUTATION AND ECONOMIC CYBERNETICS STUDIES AND RESEARCH, 2021, 55 (04): : 51 - 68
  • [3] A genetic algorithm for the resource renting problem with minimum and maximum time lags
    Ballestin, Francisco
    Evolutionary Computation in Combinatorial Optimization, Proceedings, 2007, 4446 : 25 - 35
  • [4] Resource leveling in projects with flexible structures
    Li, Hongbo
    Zheng, Linwen
    Zhu, Hanyu
    ANNALS OF OPERATIONS RESEARCH, 2023, 321 (1-2) : 311 - 342
  • [5] Resource leveling in projects with flexible structures
    Hongbo Li
    Linwen Zheng
    Hanyu Zhu
    Annals of Operations Research, 2023, 321 : 311 - 342
  • [6] Optimizing Resource Leveling in Construction Projects
    El-Rayes, Khaled
    Jun, Dho Heon
    JOURNAL OF CONSTRUCTION ENGINEERING AND MANAGEMENT-ASCE, 2009, 135 (11): : 1172 - 1180
  • [7] Optimal resource leveling of multi-resource projects
    Younis, MA
    Saad, B
    COMPUTERS & INDUSTRIAL ENGINEERING, 1996, 31 (1-2) : 1 - 4
  • [8] Optimal resource leveling of multi-resource projects
    American Univ of Cairo, Cairo, Egypt
    Computers and Industrial Engineering, 1996, 31 (1-2): : 1 - 4
  • [9] The resource-constrained activity insertion problem with minimum and maximum time lags
    Christian Artigues
    Cyril Briand
    Journal of Scheduling, 2009, 12 : 447 - 460
  • [10] The resource-constrained activity insertion problem with minimum and maximum time lags
    Artigues, Christian
    Briand, Cyril
    JOURNAL OF SCHEDULING, 2009, 12 (05) : 447 - 460