Optimization of the transition from open-pit to underground operation in combined mining using (0-1) integer programming

被引:1
|
作者
Bakhtavar, E. [1 ]
Shahriar, K. [2 ]
Mirhassani, A. [3 ]
机构
[1] Urmia Univ Tech, Dept Min & Met Engn, Orumiyeh, Iran
[2] Amirkabir Univ Technol, Dept Min & Met Engn, Tehran, Iran
[3] Amirkabir Univ Technol, Dept Math & Comp Sci, Tehran, Iran
关键词
open-pit; underground; transition depth; optimization; (0-1) integer programming; combined mining;
D O I
暂无
中图分类号
TF [冶金工业];
学科分类号
0806 ;
摘要
There are many near-surface deposits with considerable vertical extent that have the potential to be mined by a combined method of open-pit and underground methods. In this regard, there is often a point called 'transition depth' where a decision has to be made whether to continue deepening the pit or change to underground methods. Recently, optimization of the transition from open-pit to underground operation has become an important challenge in mining engineering. Optimally, to model the transition problem on the basis of maximization of the profit from open-pit and underground mining, (0-1) integer programming has been used. In this method, block economic values of open-pit and underground methods should be imported to the transition model. A hypothetical example is presented in order to assess the model in detail.
引用
收藏
页码:1059 / 1064
页数:6
相关论文
共 26 条
  • [11] Optimized depth of transition from Open Pit to underground coal mining
    A. A. Ordin
    I. V. Vasil’ev
    Journal of Mining Science, 2014, 50 : 696 - 706
  • [12] An Uncertainty-based Transition from Open Pit to Underground Mining
    Khaboushan, A. Soltani
    Osanloo, M.
    INTERNATIONAL JOURNAL OF ENGINEERING, 2019, 32 (08): : 1218 - 1224
  • [13] GPS monitoring and analysis of ground movement and deformation induced by transition from open-pit to underground mining
    Ma, Fengshan
    Zhao, Haijun
    Zhang, Yamin
    Guo, Jie
    Wei, Aihua
    Wu, Zhiquan
    Zhang, Yonglong
    JOURNAL OF ROCK MECHANICS AND GEOTECHNICAL ENGINEERING, 2012, 4 (01) : 82 - 87
  • [15] A mixed integer linear programming framework for optimising the extraction strategy of open pit - underground mining options and transitions
    Afum, Bright Oppong
    Ben-Awuah, Eugene
    Askari-Nasab, Hooman
    INTERNATIONAL JOURNAL OF MINING RECLAMATION AND ENVIRONMENT, 2020, 34 (10) : 700 - 724
  • [16] A dynamic-programming based model for phase-mining optimization in open-pit metal mines
    Wang, Qing
    Xu, Xiaochuan
    Gu, Xiaowei
    ENERGY ENGINEERING AND ENVIRONMENTAL ENGINEERING, PTS 1AND 2, 2013, 316-317 : 896 - 901
  • [17] Slope Failure of Shilu Metal Mine Transition from Open-Pit to Underground Mining under Excavation Disturbance
    Yuan, Kang
    Ma, Chi
    Guo, Guolong
    Wang, Peitao
    APPLIED SCIENCES-BASEL, 2024, 14 (03):
  • [18] A 0-1 knapsack problem-based approach for solving open-pit mining problem with type-2 fuzzy parameters
    Pramanik, Aparna
    Changdar, Chiranjit
    Khan, Abhinandan
    Chatterjee, Snehamoy
    Pal, Rajat Kumar
    Sahana, Sudip Kumar
    INNOVATIONS IN SYSTEMS AND SOFTWARE ENGINEERING, 2022, 21 (1) : 165 - 178
  • [19] Use of an artificial crown pillar in transition from open pit to underground mining
    Xu, Shuai
    Suorineni, Fidelis T.
    An, Long
    Li, Yuan Hui
    Jin, Chang Yu
    INTERNATIONAL JOURNAL OF ROCK MECHANICS AND MINING SCIENCES, 2019, 117 : 118 - 131
  • [20] Using a mixed integer quadratic programming solver for the unconstrained quadratic 0-1 problem
    Billionnet, Alain
    Elloumi, Sourour
    MATHEMATICAL PROGRAMMING, 2007, 109 (01) : 55 - 68