Imperfect inspection and replacement of a system with a defective state: A cost and reliability analysis

被引:97
作者
Berrade, M. D. [1 ]
Scarf, P. A. [2 ]
Cavalcante, C. A. V. [3 ]
Dwight, R. A. [4 ]
机构
[1] Univ Zaragoza, Dept Metodos Estadist, Zaragoza 50018, Spain
[2] Univ Salford, Salford Business Sch, Salford M5 4WT, Lancs, England
[3] Univ Fed Pernambuco, Dept Prot Engn, Recife, PE, Brazil
[4] Univ Wollongong, Dept Engn, Wollongong, NSW 2522, Australia
关键词
Maintenance; Misclassification; Reliability; Condition based maintenance; DELAY-TIME MODEL; MAINTENANCE; COMPONENT; SUBJECT;
D O I
10.1016/j.ress.2013.02.024
中图分类号
T [工业技术];
学科分类号
08 ;
摘要
We consider a system with three possible states, good, defective and failed. Failures are detected as soon as they occur; the defective state, which is only revealed by inspection, does not prevent the system from fulfilling the function for which it was designed. We present a maintenance model consisting of periodic inspections to check the state of the system, in which inspections are subject to error. At a false positive inspection the system is unnecessarily replaced; at a false negative inspection a defect remains unrevealed with reliability implications for future operation. The model is illustrated with an example from the railways. In this context, we suppose that system lifetime is heterogeneous so that the time the system spends in the defective state is a random variable from a mixed distribution. We determine under what circumstances the cost of maintenance cannot be justified by its efficacy, and suggest that when there is the possibility that replacement is poorly executed (lifetime heterogeneity) the natural response to imperfect inspection of increasing the inspection frequency can be counter-productive. (C) 2013 Elsevier Ltd. All rights reserved.
引用
收藏
页码:80 / 87
页数:8
相关论文
共 19 条
  • [1] [Anonymous], 1996, Stochastic Processes
  • [2] Ascher H., 1984, REPAIRABLE SYSTEMS R
  • [3] Baker R, 1991, IMA J MATH APPL BUSI, V3, P259
  • [4] Baker R. D., 1997, IMA Journal of Mathematics Applied in Business and Industry, V8, P83, DOI 10.1093/imaman/8.1.83
  • [5] Maintenance scheduling of a protection system subject to imperfect inspection and replacement
    Berrade, M. D.
    Cavalcante, Cristiano A. V.
    Scarf, Philip A.
    [J]. EUROPEAN JOURNAL OF OPERATIONAL RESEARCH, 2012, 218 (03) : 716 - 725
  • [6] Berrade MD, 2011, ADV SAFETY RELIABILI, P796
  • [7] A study of a two-phase inspection policy for a preparedness system with a defective state and heterogeneous lifetime
    Cavalcante, Cristiano A. V.
    Scarf, Philip A.
    de Almeida, Adiel T.
    [J]. RELIABILITY ENGINEERING & SYSTEM SAFETY, 2011, 96 (06) : 627 - 635
  • [8] Christer A. H., 1995, IMA Journal of Mathematics Applied in Business and Industry, V6, P205, DOI 10.1093/imaman/6.2.205
  • [10] Jia X., 2002, IMA Journal of Management Mathematics, V13, P39, DOI 10.1093/imaman/13.1.39