Analysis of tunnel lining behaviour in soft soil during the construction stage, Second Heinenoord Tunnel

被引:0
|
作者
van Oosterhout, GPC [1 ]
Blom, CBM [1 ]
Jovanovic, PS [1 ]
机构
[1] TNO, Bldg & Construct Res, Delft, Netherlands
关键词
assembly stresses; segmented tunnel lining; structural behaviour; construction stage;
D O I
暂无
中图分类号
TU [建筑科学];
学科分类号
0813 ;
摘要
The paper addresses observations of the structural behaviour of the Tweede Heinenoordtunnel, a shield-driven tunnel in typical Dutch soft soils. Two rings were equipped with structural monitoring instrumentation. The measurements have shown that the assembly of the rings causes very significant initial forces and moments in the segments. Moreover, these initial forces and moments do not decrease significantly, as is often believed. Since conventional tunnel design models do not consider the effects of assembly on forces and moments, predicted maximum forces and moments in the lining appeared to be about half the measured values. Another important observation is that near the closing segment strong three dimensional effects occur as ring forces seem to migrate through small zones of the key segment.
引用
收藏
页码:2087 / 2092
页数:6
相关论文
共 50 条
  • [31] Impact of an underlying soft soil layer on tunnel lining in seismic conditions
    Sun, Qiangqiang
    Dias, Daniel
    Ribeiro e Sousa, Luis
    TUNNELLING AND UNDERGROUND SPACE TECHNOLOGY, 2019, 90 : 293 - 308
  • [32] Analytical model for the beam action of a tunnel lining during construction
    Talmon, A. M.
    Bezuijen, A.
    INTERNATIONAL JOURNAL FOR NUMERICAL AND ANALYTICAL METHODS IN GEOMECHANICS, 2013, 37 (02) : 181 - 200
  • [33] Effects of disturbance during tunnel construction on dynamic response of tunnel-soil body system during tunnel construction period
    Su G.
    Di H.
    Zhou S.
    Guo H.
    Zhang X.
    Zhendong yu Chongji/Journal of Vibration and Shock, 2023, 42 (15): : 210 - 218
  • [34] Concrete lining construction for tailwater tunnel
    Ren Min Chang Jiang, 4 (13-14, 22):
  • [35] Investigation of cracking mechanism of the first tunnel lining during double-arch tunnel construction
    Sui, Yi
    Cheng, Xiaohui
    Zhao, Zuozhou
    Ma, Weibin
    UNDERGROUND SPACE, 2024, 14 : 1 - 17
  • [36] Deformation and mechanical characteristics of tunnel lining in tunnel intersection between subway station tunnel and construction tunnel
    Li, Yayong
    Jin, Xiaoguang
    Lv, Zhitao
    Dong, Jianghui
    Guo, Jincheng
    TUNNELLING AND UNDERGROUND SPACE TECHNOLOGY, 2016, 56 : 22 - 33
  • [37] Predictions and instrumentation of an extensive monitoring scheme in the Netherlands, Second Heinenoord tunnel
    van Schelt, W
    Jovanovic, PS
    Plekkenpol, JW
    Bakker, KJ
    NORTH AMERICAN TUNNELING '98, 1998, : 137 - 144
  • [38] Analysis of mechanical characteristic of shield tunnel segments lining and its influence during construction
    Ye Fei
    He Chuan
    Wang Shi-min
    ROCK AND SOIL MECHANICS, 2011, 32 (06) : 1801 - +
  • [39] Effect of new tunnel construction on structural performance of existing tunnel lining
    Yoo, Chungsik
    Cui, Shuaishuai
    GEOMECHANICS AND ENGINEERING, 2020, 22 (06) : 497 - 507
  • [40] Three-dimensional FEM simulation of shield-driven tunnel lining during construction stage
    Zhang Hai-bo
    Yin Zong-ze
    Zhu Jun-gao
    Li Cui-xia
    ROCK AND SOIL MECHANICS, 2005, 26 (06) : 990 - +