共 50 条
- [22] Predictions and a monitoring scheme with respect to the boring of the Second Heinenoord Tunnel GEOTECHNICAL ASPECTS OF UNDERGROUND CONSTRUCTION IN SOFT GROUND, 1996, : 459 - 464
- [23] Behaviour of tunnel lining material in road tunnel fire INTERNATIONAL CONFERENCE ON RECENT ADVANCES IN MATERIALS & MANUFACTURING TECHNOLOGIES, 2018, 346
- [24] Monitoring pilot projects using bored tunnelling: The Second Heinenoord Tunnel and the Botlek Rail Tunnel Tunnelling and Underground Space Technology, 14 (02): : 121 - 129
- [25] Assessment on the safety of shotcrete lining during tunnel construction Beijing Jiaotong Daxue Xuebao/Journal of Beijing Jiaotong University, 2008, 32 (01): : 1 - 6
- [28] Analysis of the Possible Cracking and Damages of Tunnel Lining Segments during Installing Stage Soil Mechanics and Foundation Engineering, 2021, 58 : 287 - 294