Analysis on the Relationship Between Layout and Consumption of Face Cutters on Hard Rock Tunnel Boring Machines (TBMs)

被引:22
|
作者
Geng, Qi [1 ,2 ,3 ]
Bruland, Amund [3 ]
Macias, Francisco Javier [3 ,4 ]
机构
[1] Changan Univ, Sch Construct Machinery, Xian 710064, Shaanxi, Peoples R China
[2] Xi An Jiao Tong Univ, State Key Lab Mfg Syst Engn, Xian 710049, Shaanxi, Peoples R China
[3] NTNU, Dept Civil & Transport Engn, N-7491 Trondheim, Norway
[4] SINTEF Bldg & Infrastruct Rock & Soil Engn, N-7491 Trondheim, Norway
关键词
Tunnel boring machine; Disc cutter layout; Disc cutter consumption; Shape curve; ABRASIVITY TEST; DESIGN; PERFORMANCE; ALGORITHM; STRENGTH; FRACTURE;
D O I
10.1007/s00603-017-1320-1
中图分类号
P5 [地质学];
学科分类号
0709 ; 081803 ;
摘要
The consumption of TBM disc cutters is influenced by the ground conditions (e.g. intact rock properties, rock mass properties, etc.), the TBM boring parameters (e.g. thrust, RPM, penetration, etc.) and the cutterhead design parameters (e.g. cutterhead shape, cutter layout). Previous researchers have done much work on the influence of the ground conditions and TBM boring parameters on cutter consumption; however, limited research has been found on the relationship between the cutterhead design and cutter consumption. The purpose of the present paper is to study the influence of layout on consumption for the TBM face cutters. Data collected from six tunnels (i.e. the Rossaga Headrace Tunnel in Norway, the Qinling Railway Tunnel in China, tubes 3 and 4 of the Guadarrama Railway Tunnel in Spain, the parallel tubes of the Vigo-Das Maceiras Tunnel in Spain) were used for analysis. The cutter consumption shape curve defined as the fitted function of the normalized cutter consumption versus the cutter position radius is found to be uniquely determined by the cutter layout and was used for analysis. The straightness and smoothness indexes are introduced to evaluate the quality of the shape curves. The analytical results suggest that the spacing of face cutters in the inner and outer parts of cutterhead should to be slightly larger and smaller, respectively, than the average spacing, and the difference of the position angles between the neighbouring cutters should be constant among the cutter positions. The 2-spiral layout pattern is found to be better than other layout patterns in view of cutter consumption and cutterhead force balance.
引用
收藏
页码:279 / 297
页数:19
相关论文
共 50 条
  • [41] Prediction of the Penetration Rate and Number of Consumed Disc Cutters of Tunnel Boring Machines (TBMs) Using Artificial Neural Network (ANN) and Support Vector Machine (SVM)-Case Study: Beheshtabad Water Conveyance Tunnel in Iran
    Afradi, Alireza
    Ebrahimabadi, Arash
    Hallajian, Tahereh
    ASIAN JOURNAL OF WATER ENVIRONMENT AND POLLUTION, 2019, 16 (01) : 49 - 57
  • [42] Total loads modeling and geological adaptability analysis for mixed soil-rock tunnel boring machines
    Qi, Wencong
    Wang, Lihui
    Zhou, Siyang
    Kang, Yilan
    Zhang, Qian
    UNDERGROUND SPACE, 2022, 7 (03) : 337 - 351
  • [43] Adaptive Robust Coordinated Control for Over-actuated Cutter-head Driving Systems of Hard Rock Tunnel Boring Machines
    Liao, Jianfeng
    Yao, Bin
    Zhu, Xiaocong
    IFAC PAPERSONLINE, 2016, 49 (21): : 611 - 616
  • [44] Stability analysis of the rock zone between the tunnel face and the fault fracture zone
    Du, Jianming
    Dong, Baosheng
    Zhang, Xuan
    TRANSPORTATION SAFETY AND ENVIRONMENT, 2024, 6 (04):
  • [45] Comparison of the mechanical performance between two-stage and flat-face cutter head for the rock tunnel boring machine (TBM)
    Geng Qi
    Wei Zhengying
    He Fei
    Meng Hao
    JOURNAL OF MECHANICAL SCIENCE AND TECHNOLOGY, 2015, 29 (05) : 2047 - 2058
  • [46] Comparison of the mechanical performance between two-stage and flat-face cutter head for the rock tunnel boring machine (TBM)
    Geng Qi
    Wei Zhengying
    He Fei
    Meng Hao
    Journal of Mechanical Science and Technology, 2015, 29 : 2047 - 2058
  • [47] Stability Analysis of Rock Wall between Tunnel Face and Karst Cavity with High Pressurized Water
    Guo, Jiaqi
    Chen, Jianxun
    Liu, Qin
    ELECTRONIC JOURNAL OF GEOTECHNICAL ENGINEERING, 2016, 21 (04): : 1689 - 1700
  • [48] Determining the Particle Size of Debris from a Tunnel Boring Machine Through Photographic Analysis and Comparison Between Excavation Performance and Rock Mass Properties
    A. Rispoli
    A. M. Ferrero
    M. Cardu
    A. Farinetti
    Rock Mechanics and Rock Engineering, 2017, 50 : 2805 - 2816
  • [49] Determining the Particle Size of Debris from a Tunnel Boring Machine Through Photographic Analysis and Comparison Between Excavation Performance and Rock Mass Properties
    Rispoli, A.
    Ferrero, A. M.
    Cardu, M.
    Farinetti, A.
    ROCK MECHANICS AND ROCK ENGINEERING, 2017, 50 (10) : 2805 - 2816
  • [50] A risk analysis model of the relationship between beverage consumption from school vending machines and risk of adolescent overweight
    Forshee, RA
    Storey, ML
    Ginevan, ME
    RISK ANALYSIS, 2005, 25 (05) : 1121 - 1135