共 50 条
- [31] Optimal Disc Cutters Plane Layout Design of the Full-Face Rock Tunnel Boring Machine (TBM) Using an Ant Colony Optimization Algorithm INTELLIGENT ROBOTICS AND APPLICATIONS, PROCEEDINGS, 2009, 5928 : 443 - +
- [32] Fuzzy Modeling Approaches for the Prediction of Machine Utilization in Hard Rock Tunnel Boring Machines CONFERENCE RECORD OF THE 2006 IEEE INDUSTRY APPLICATIONS CONFERENCE, FORTY-FIRST IAS ANNUAL MEETING, VOL 1-5, 2006, : 947 - 954
- [33] RECENT DEVELOPMENT IN THE DESIGN OF HARD ROCK TUNNEL BORING MACHINES FOR THE MINING-INDUSTRY HIGH LEVEL RADIOACTIVE WASTE MANAGEMENT, VOLS 1 AND 2, 1991, : 1622 - 1635
- [35] Optimal disc cutters plane layout design of the full-face rock tunnel boring machine (tbm) based on a multi-objective genetic algorithm Journal of Mechanical Science and Technology, 2010, 24 : 521 - 528
- [36] Study on Optimum Free-face Condition of Cutting Hard Rock with Tunnel Boring Machine Hob PERIODICA POLYTECHNICA-CIVIL ENGINEERING, 2021, 65 (02): : 510 - 521
- [37] Analysis on the Stress and Failures of Disc Cutter of Full Face Rock Tunnel Boring Machine DIGITAL DESIGN AND MANUFACTURING TECHNOLOGY, PTS 1 AND 2, 2010, 102-104 : 223 - +
- [38] Analysis of the mechanic model of cutterhead bearing of a full face rock tunnel boring machine Yingyong Jichu yu Gongcheng Kexue Xuebao/Journal of Basic Science and Engineering, 2010, 18 (SUPPL. 1): : 225 - 232
- [39] Reliability Analysis of Full-Face Tunnel Boring Machines with the Monte Carlo Simulation Technique RUDARSKO-GEOLOSKO-NAFTNI ZBORNIK, 2022, 37 (03): : 149 - 160
- [40] Risk analysis and geologic survey before construction by a full face rock tunnel boring machine Yingyong Jichu yu Gongcheng Kexue Xuebao/Journal of Basic Science and Engineering, 2007, 15 (02): : 171 - 176