Research on the risk assessment method of PPP project based on the improved matter element model

被引:8
作者
Liu, B. [1 ]
Sun, F-H [2 ]
机构
[1] Nanjing Forestry Univ, Sch Civil Engn, Dept Engn Management, Nanjing, Peoples R China
[2] Hohai Univ, Sch Business, Dept Accounting, Nanjing, Peoples R China
基金
中国国家自然科学基金;
关键词
PPP project risk management; Risk assessment; Risk identification; Improved matter element model; Index system; PUBLIC-PRIVATE PARTNERSHIPS; MANAGEMENT;
D O I
10.24200/sci.2018.5295.1187
中图分类号
T [工业技术];
学科分类号
08 ;
摘要
When identifying (Public-Private-Partnership) PPP project risks using the decomposition analysis method, the PPP project risks are considered to include government risk, market risk, and project risk. Based on these facts, a constructed list of PPP project risks is established, which can be divided into three first-class indexes and 27 second-class indexes. Based on the analysis of the traditional matter element model limitations, the evaluation model of PPP project risk assessment of the improved matter element model is established in order to provide effective support, for effective PPP project risk management, contract management, and other work. Lastly, the feasibility of theoretical research is verified by a case study. (C) 2020 Sharif University of Technology. All rights reserved.
引用
收藏
页码:614 / 624
页数:11
相关论文
共 50 条
  • [41] Risk assessment of contractor support based on improved risk matrix method
    Zhang F.-Y.
    Li D.-Y.
    Geng B.
    Liu Z.-L.
    Journal of Shanghai Jiaotong University (Science), 2015, 20 (04) : 464 - 467
  • [42] Model design of project risk assessment based on cloud theory
    School of Economics and Management, Beijing University of Aeronautics and Astronautics, Beijing 100191, China
    Beijing Hangkong Hangtian Daxue Xuebao, 2008, 12 (1445-1447):
  • [43] Risk Assessment of Extended Reach Well based on Gray Matter-Element
    Zhang, Hui
    Gao, Deli
    Liu, Wensheng
    NATURAL RESOURCES AND SUSTAINABLE DEVELOPMENT, PTS 1-3, 2012, 361-363 : 386 - 392
  • [44] The Project Cost Risk Assessment Based On AHP
    Qian, Huachao
    Wang, Qi
    Liu, Xiaowen
    PROCEEDINGS OF THE 2015 INTERNATIONAL CONFERENCE ON INDUSTRIAL TECHNOLOGY AND MANAGEMENT SCIENCE (ITMS 2015), 2015, 34 : 1189 - 1191
  • [45] Risk transfer process in urban comprehensive corridor PPP project based on complex network model
    Yang L.
    Wang J.-J.
    Zhejiang Daxue Xuebao (Gongxue Ban)/Journal of Zhejiang University (Engineering Science), 2020, 54 (09): : 1666 - 1676
  • [46] An Improved Method for Risk Assessment of Carrier-Based Aircraft
    Zhu, Qidan
    Li, Hui
    Zhang, Zhi
    Wang, Lipeng
    PROCEEDING OF THE IEEE INTERNATIONAL CONFERENCE ON INFORMATION AND AUTOMATION, 2012, : 777 - 782
  • [47] Risk Assessment Research of Enterprise BI Project Implementation Based on Fuzzy Comprehensive Assessment
    Ma, XiaoLong
    Liu, LanJuan
    PROCEEDINGS OF THE 2015 INTERNATIONAL CONFERENCE ON SOCIAL SCIENCE, EDUCATION MANAGEMENT AND SPORTS EDUCATION, 2015, 39 : 2457 - 2462
  • [48] Research on Risk Assessment of Photovoltaic Building Project by Triangular Fuzzy Number Method
    Liu, Yi
    Dai, Xintong
    Meng, Qingzhe
    PROCEEDINGS OF THE 2015 INTERNATIONAL CONFERENCE ON EDUCATION REFORM AND MODERN MANAGEMENT (ERMM 2015), 2015, 15 : 354 - 358
  • [49] Research on Risk Assessment of Smart Grid Project
    Xu, Wanyu
    PROCEEDINGS OF THE 2015 4TH NATIONAL CONFERENCE ON ELECTRICAL, ELECTRONICS AND COMPUTER ENGINEERING ( NCEECE 2015), 2016, 47 : 558 - 562
  • [50] Demand response evaluation of RIES based on improved matter-element extension model
    Wang, Yongli
    Li, Fang
    Yang, Jiale
    Zhou, Minhan
    Song, Fuhao
    Zhang, Danyang
    Xue, Lu
    Zhu, Jinrong
    ENERGY, 2020, 212