Research on the risk assessment method of PPP project based on the improved matter element model

被引:8
作者
Liu, B. [1 ]
Sun, F-H [2 ]
机构
[1] Nanjing Forestry Univ, Sch Civil Engn, Dept Engn Management, Nanjing, Peoples R China
[2] Hohai Univ, Sch Business, Dept Accounting, Nanjing, Peoples R China
基金
中国国家自然科学基金;
关键词
PPP project risk management; Risk assessment; Risk identification; Improved matter element model; Index system; PUBLIC-PRIVATE PARTNERSHIPS; MANAGEMENT;
D O I
10.24200/sci.2018.5295.1187
中图分类号
T [工业技术];
学科分类号
08 ;
摘要
When identifying (Public-Private-Partnership) PPP project risks using the decomposition analysis method, the PPP project risks are considered to include government risk, market risk, and project risk. Based on these facts, a constructed list of PPP project risks is established, which can be divided into three first-class indexes and 27 second-class indexes. Based on the analysis of the traditional matter element model limitations, the evaluation model of PPP project risk assessment of the improved matter element model is established in order to provide effective support, for effective PPP project risk management, contract management, and other work. Lastly, the feasibility of theoretical research is verified by a case study. (C) 2020 Sharif University of Technology. All rights reserved.
引用
收藏
页码:614 / 624
页数:11
相关论文
共 50 条
  • [31] Risk assessment of transmission towers based on variable weight theory and matter-element extension model
    Gao, Haihang
    Wang, Minzhen
    Wang, Zhigang
    Zhang, Jiyao
    Zheng, Yu
    Zhang, Qi
    ENGINEERING RESEARCH EXPRESS, 2024, 6 (04):
  • [32] Assessment Model and Method Research of Information Security Risk
    Lu Zhen
    Xiong Zhen
    Tu Keqin
    FRONTIERS OF MANUFACTURING AND DESIGN SCIENCE IV, PTS 1-5, 2014, 496-500 : 2170 - +
  • [33] The Model Combined the BT Project And Land Development Risk Assessment Research
    Yuan Hai-lin
    Cai Wen-ying
    ENGINEERING AND RISK MANAGEMENT, 2011, 1 : 250 - 256
  • [34] Research on the Risk Assessment Model in Construction Project's Life Cycle
    Lai Yu
    Luo Fuzhou
    PROCEEDINGS OF THE 1ST INTERNATIONAL CONFERENCE ON SUSTAINABLE CONSTRUCTION & RISK MANAGEMENT, VOLS I AND II, 2010, : 52 - 55
  • [35] Risk Evaluation of Water Environmental Treatment PPP Projects Based on the Intuitionistic Fuzzy MULTIMOORA Improved FMEA Method
    Li, Huimin
    Liang, Mengxuan
    Zhang, Chengyi
    Cao, Yongchao
    SYSTEMS, 2022, 10 (05):
  • [36] Risk Assessment of Contractor Support Based on Improved Risk Matrix Method
    张福元
    李东阳
    耿斌
    刘占岭
    JournalofShanghaiJiaotongUniversity(Science), 2015, 20 (04) : 464 - 467
  • [37] Safety Risk Assessment of Overturning Construction of Towering Structure Based on Cloud Matter-Element Coupled Model
    Sang, Yingxue
    Han, Fengxia
    Liu, Qing
    Qiao, Liang
    Wang, Shouxi
    CMES-COMPUTER MODELING IN ENGINEERING & SCIENCES, 2023, 136 (02): : 1973 - 1998
  • [38] Risk Assessment of Water Environment Treatment PPP Projects Based on a Cloud Model
    Zhang, Yaqiong
    He, Nan
    Li, Yijing
    Chen, Yiyang
    Wang, Lei
    Ran, Yunlong
    DISCRETE DYNAMICS IN NATURE AND SOCIETY, 2021, 2021
  • [39] Risk Assessment for Engagement in Sharing Economy of Manufacturing Enterprises: A Matter-Element Extension Based Approach
    Xiao, Quan
    Wan, Shanshan
    Lu, Fucai
    Li, Shun
    SUSTAINABILITY, 2019, 11 (17)
  • [40] A Model of Risk Assessment of Software Project Based on Grey Theory
    Pang Qinghua
    ICCSSE 2009: PROCEEDINGS OF 2009 4TH INTERNATIONAL CONFERENCE ON COMPUTER SCIENCE & EDUCATION, 2009, : 538 - 541