Research on the risk assessment method of PPP project based on the improved matter element model

被引:8
作者
Liu, B. [1 ]
Sun, F-H [2 ]
机构
[1] Nanjing Forestry Univ, Sch Civil Engn, Dept Engn Management, Nanjing, Peoples R China
[2] Hohai Univ, Sch Business, Dept Accounting, Nanjing, Peoples R China
基金
中国国家自然科学基金;
关键词
PPP project risk management; Risk assessment; Risk identification; Improved matter element model; Index system; PUBLIC-PRIVATE PARTNERSHIPS; MANAGEMENT;
D O I
10.24200/sci.2018.5295.1187
中图分类号
T [工业技术];
学科分类号
08 ;
摘要
When identifying (Public-Private-Partnership) PPP project risks using the decomposition analysis method, the PPP project risks are considered to include government risk, market risk, and project risk. Based on these facts, a constructed list of PPP project risks is established, which can be divided into three first-class indexes and 27 second-class indexes. Based on the analysis of the traditional matter element model limitations, the evaluation model of PPP project risk assessment of the improved matter element model is established in order to provide effective support, for effective PPP project risk management, contract management, and other work. Lastly, the feasibility of theoretical research is verified by a case study. (C) 2020 Sharif University of Technology. All rights reserved.
引用
收藏
页码:614 / 624
页数:11
相关论文
共 50 条
  • [1] A Risk Assessment Method of Chemical Contaminants in Meat Products Based on Improved Matter-Element Extension Model
    Dou H.
    Chen Y.
    Wu C.
    Guo W.
    Zhang F.
    Shipin Kexue/Food Science, 2023, 44 (11): : 1 - 8
  • [2] Improved Design of Risk Assessment Model for PPP Project under the Development of Marine Architecture
    Liu, Yang
    Hao, Yu
    Lu, Yulong
    JOURNAL OF COASTAL RESEARCH, 2018, : 74 - 80
  • [3] A Risk Assessment Model of Coalbed Methane Development Based on the Matter-Element Extension Method
    Wang, Wanqing
    Lyu, Shuran
    Zhang, Yudong
    Ma, Shuqi
    ENERGIES, 2019, 12 (20)
  • [4] Research on Smart Grid Risk Assessment Based on Matter-Element Extenics
    Zhou, Jing
    Mu, Zhaoxi
    INTERNATIONAL JOURNAL OF SECURITY AND ITS APPLICATIONS, 2016, 10 (08): : 215 - 224
  • [5] Risk Assessment Model and Applied Research on Municipal PPP Projects
    Wang, Liping
    Zhang, Pu
    Zhang, Pei
    Zhao, Yawei
    Ma, Yuan
    PROCEEDINGS OF THE 2016 INTERNATIONAL CONFERENCE ON ARCHITECTURAL ENGINEERING AND CIVIL ENGINEERING, 2016, 72 : 292 - 297
  • [6] Comprehensive Evaluation Method Research Based on Matter-Element Analysis in Fund Project Review
    Li, Haifeng
    Dang, Yanzhong
    2010 2ND INTERNATIONAL ASIA CONFERENCE ON INFORMATICS IN CONTROL, AUTOMATION AND ROBOTICS (CAR 2010), VOL 2, 2010, : 496 - 499
  • [7] Risk Assessment of TBM Construction Based on a Matter-Element Extension Model with Optimized Weight Distribution
    Fu, Tao
    Shi, Kebin
    Shi, Renyi
    Lu, Zhipeng
    Zhang, Jianming
    APPLIED SCIENCES-BASEL, 2024, 14 (13):
  • [8] Campus Network Information Security Risk Assessment Based on FAHP and Matter Element Model
    Geng, Fangfang
    Ruan, Xiaolong
    INTELLIGENT COMPUTING METHODOLOGIES, ICIC 2017, PT III, 2017, 10363 : 298 - 306
  • [9] Research on Enterprise Credit Risk Assessment Method Based on Improved Genetic Algorithm
    Li Jinjuan
    PROCEEDINGS OF 2017 9TH INTERNATIONAL CONFERENCE ON MEASURING TECHNOLOGY AND MECHATRONICS AUTOMATION (ICMTMA), 2017, : 215 - 218
  • [10] STUDY ON RISK EVALUATION MODEL OF PPP PROJECT BASED ON VAGUE VALUE
    Hu, Li
    Zhang, Weiguo
    Lou, Tingting
    PROCEEDINGS OF THE FIRST INTERNATIONAL CONFERENCE ON SUSTAINABLE URBANIZATION (ICSU 2010), 2010, : 361 - 369