Effect of full-bore natural gas release on fire and individual risks: A case study for an LNG-Fueled ship

被引:21
作者
Chu, Bongsik [1 ]
Chang, Daejun [1 ]
机构
[1] Korea Adv Inst Sci & Technol, Sch Mech Aerosp & Syst Engn, Dept Mech Engn, 291 Daehak Ro, Daejeon 34141, South Korea
关键词
Quantitative risk assessment; Hydrocarbon fire; Full-bore leak; Individual risk; LNG fuel gas supply system; ECONOMIC-EVALUATION; SUPPLY SYSTEMS; SAFETY; FPSO;
D O I
10.1016/j.jngse.2016.11.043
中图分类号
TE [石油、天然气工业]; TK [能源与动力工程];
学科分类号
0807 ; 0820 ;
摘要
This study investigated the significance of categorizing and selecting representative leak sizes in Quantitative Risk Assessment (QRA) for estimating natural gas fire risks. In most fire QRA procedures, the full-bore sizes of leaks have been overlooked even though they causes the catastrophic consequences with relatively high frequencies. So, in the present study, the effect of particular leak sizes on the individual risks (IRs) were investigated through the fire risk assessment. As case studies, LNG (Liquefied Natural Gas) fuel gas supply system for a large ship were considered with three different approaches. Approach 1 considers only three categories of leak sizes; small, medium, and large. Approach 2 includes the full-bore leak in addition to categories of Approach 1, and Approach 3 reflects more categories of leak sizes with every 1 mm increment in diameter. Compared with the total IR of Approach 3, the total IR of Approach 1 was two times lower, whereas Approach 2 resulted in the comparable total IR with an approximately 4% deviation. Admitting that Approach 3 should be close to the exact solution, Approach 2 gave acceptable results, whereas Approach 1 unsatisfactorily underestimated the total IR. The results indicated that full-bore leak accidents are critically important scenarios and omission of them can lead to misjudgment in the risk-informed decision-making process. Taking the full-bore accidents into additional account to the conventional simplified QRA can reduce the time and effort for estimating the leak related risks without a significant loss of accuracy in the estimated risks. (C) 2016 Elsevier B.V. All rights reserved.
引用
收藏
页码:234 / 247
页数:14
相关论文
共 36 条
[1]   A risk-based method for determining passive fire protection adequacy [J].
Ahmad, Arshad ;
Hassan, Siti Ayesah ;
Ripin, Adnan ;
Ali, Mohamad W. ;
Haron, Saharudin .
FIRE SAFETY JOURNAL, 2013, 58 :160-169
[2]  
[Anonymous], 4341 OGP
[3]  
[Anonymous], CGD13775 NTIS
[4]   A risk-based decision making approach to determine fireproofing requirements against jet fires [J].
Badri, Naser ;
Rad, Amirhosein ;
Kareshki, Hamid ;
Abdolhamidzadeh, Bahman ;
Parvizsedghy, Roghaieh ;
Rashtchian, Davood .
JOURNAL OF LOSS PREVENTION IN THE PROCESS INDUSTRIES, 2013, 26 (04) :771-781
[5]   Time-dependent risk modeling of accidental events and responses in process industries [J].
Bris, Radim ;
Medonos, Sava ;
Wilkins, Chris ;
Zdrahala, Adam .
RELIABILITY ENGINEERING & SYSTEM SAFETY, 2014, 125 :54-66
[6]  
Celnik M., 2012, ICHEME S SERIES, V158
[7]  
Cox A W., 1990, Classification of hazardous locations
[8]   Quantitative risk analysis of fire and explosion on the top-side LNG-liquefaction process of LNG-FPSO [J].
Dan, Seungkyu ;
Lee, Chang Jun ;
Park, Jeongpil ;
Shin, Dongil ;
Yoon, En Sup .
PROCESS SAFETY AND ENVIRONMENTAL PROTECTION, 2014, 92 (05) :430-441
[9]   The impact of the energy efficiency design index on very large crude carrier design and CO2 emissions [J].
Devanney, Jack .
SHIPS AND OFFSHORE STRUCTURES, 2011, 6 (04) :355-368
[10]  
DNV, 2007, DNV LEAK VERS 3 21