Aligning Misaligned Systemic Innovations: Probing Inter-Firm Effects Development in Project Networks

被引:27
作者
Alin, Pauli [1 ]
Maunula, Antti O. [2 ]
Taylor, John E. [3 ]
Smeds, Riitta [1 ]
机构
[1] Aalto Univ, Simlab, Dept Ind Engn & Management, Sch Sci, Espoo, Finland
[2] Magenta Advisory Oy, Helsinki, Finland
[3] Virginia Tech, Charles E Via Jr Dept Civil & Environm Engn, Blacksburg, VA USA
关键词
alignment; building information modeling; innovation; interorganizational process alignment; project networks; systemic innovation; technology implementation; ABSORPTIVE-CAPACITY; CONSTRUCTION; TECHNOLOGY; KNOWLEDGE; ORGANIZATIONS; CAPABILITY; OBJECTS; DESIGN; MODELS; VIEW;
D O I
10.1002/pmj.21316
中图分类号
C93 [管理学];
学科分类号
12 ; 1201 ; 1202 ; 120202 ;
摘要
Implementing systemic innovations in a project network can significantly improve its performance; however, implementing systemic innovations is difficult if project network structures misalign to the innovation. Little research has examined how project network structures can align to systemic innovations. To address this research gap, we studied an advanced building information modeling tool implemented in a Finnish design and development project network. We found that misaligned innovations are aligned through a process of task sequence alignment, knowledge base alignment, and work allocation alignment. Our findings are important; they suggest that implementing systemic innovations in project networks is a multistage inter-firm process.
引用
收藏
页码:77 / 93
页数:17
相关论文
共 58 条
[41]   Interdependencies in complex project ecologies: The case of biomedical innovation [J].
Newell, Sue ;
Goussevskaia, Anna ;
Swan, Jacky ;
Bresnen, Mike ;
Obembe, Ademola .
LONG RANGE PLANNING, 2008, 41 (01) :33-54
[42]  
Nissen M. E., 2004, Knowledge Management Research & Practice, V2, P169, DOI 10.1057/palgrave.kmrp.8500039
[43]   Knowing in practice: Enacting a collective capability in distributed organizing [J].
Orlikowski, WJ .
ORGANIZATION SCIENCE, 2002, 13 (03) :249-273
[44]   Global business process development in a virtual community of practice [J].
Smeds, R ;
Alvesalo, J .
PRODUCTION PLANNING & CONTROL, 2003, 14 (04) :361-371
[45]  
Strauss A., 1998, BASICS QUALITATIVE R
[46]   A foundation for interoperability in next-generation product development systems [J].
Szykman, S ;
Fenves, SJ ;
Keirouz, W ;
Shooter, SB .
COMPUTER-AIDED DESIGN, 2001, 33 (07) :545-559
[47]  
Taylor J.E., 2004, Innovations: Project Management Research, P83
[48]  
Taylor JE., 2007, PROJ MANAG J, V38, P22, DOI DOI 10.1002/PMJ.20003
[49]   Antecedents of successful three-dimensional computer-aided design implementation in design and construction networks [J].
Taylor, John E. .
JOURNAL OF CONSTRUCTION ENGINEERING AND MANAGEMENT, 2007, 133 (12) :993-1002
[50]   Paradigm Trajectories of Building Information Modeling Practice in Project Networks [J].
Taylor, John E. ;
Bernstein, Phillip G. .
JOURNAL OF MANAGEMENT IN ENGINEERING, 2009, 25 (02) :69-76