Probabilistic Methods to Assess the Fire Risk of an Industrial Building

被引:2
|
作者
Darmon, Ruxandra [1 ]
机构
[1] Tech Univ Cluj Napoca, Daicoviciu 15, Cluj Napoca 400020, Romania
关键词
Fire risk assessment; industrial buildings; event trees; separation elements; property protection;
D O I
10.1016/j.promfg.2020.03.078
中图分类号
T [工业技术];
学科分类号
08 ;
摘要
Fire safety is one of the major issues that affects the whole life cycle of a building from the early design stages until the dismantling. A risk management plan gives a better overview of the whole activity process, revealing the relations between all the factors involved during the building service life. The use of engineering principles in designing the fire safety strategy can improve the design flexibility and it can often reduce the costs related to the fire protection materials and equipment. Due to the complexity of the building system, a probabilistic approach is considered in order to assess the risk and consequences associated with a fire event in an industrial building. The event trees method has been used to assess the frequency of a fire event in an industrial building and the associated consequences. The probability risk assessment criteria are set considering the property protection and business continuity objectives in addition to life safety requirements. The article covers a study case of fire risk assessment regarded as an optimization technique for sustainable manufacturing and a better management of the fire protection systems in the industrial buildings. A probabilistic approach for an engineering problem provides a numerical value of risk, which can also be useful to quantify the probability of unlikely events associated with severe consequences. Moreover, the probabilistic risk analysis provides data for cost-benefit analysis, which is the starting point for any cost optimisation strategy. (C) 2020 The Authors. Published by Elsevier B.V.
引用
收藏
页码:543 / 548
页数:6
相关论文
共 50 条
  • [1] Fire risk assessment and efficiency study of active and passive protection methods in reducing the risk of fire in a control room of at an industrial building
    Askaripoor, Taleb
    Shirali, Gholam Abbas
    Yarahmadi, Rasool
    Kazemi, Elahe
    JOURNAL OF HEALTH AND SAFETY AT WORK, 2018, 8 (01) : 93 - +
  • [2] Comparison and Analysis of Building Fire Risk Assessment Methods
    Wu, Lizhi
    Guo, Shigang
    2018 3RD INTERNATIONAL CONFERENCE ON SYSTEM RELIABILITY AND SAFETY (ICSRS), 2018, : 381 - 385
  • [3] PROBABILISTIC FIRE RISK ANALYSIS
    HOFFMANN, HH
    BREILING, G
    BERG, HP
    KERNTECHNIK, 1995, 60 (2-3) : 117 - 121
  • [4] Building probabilistic models of fire occurrence and fire risk zoning using logistic regression in Shanxi Province, China
    Pan, Jinghu
    Wang, Weiguo
    Li, Junfeng
    NATURAL HAZARDS, 2016, 81 (03) : 1879 - 1899
  • [5] Building probabilistic models of fire occurrence and fire risk zoning using logistic regression in Shanxi Province, China
    Jinghu Pan
    Weiguo Wang
    Junfeng Li
    Natural Hazards, 2016, 81 : 1879 - 1899
  • [6] Visual inspection and evaluation using NDT testing methods of industrial building after fire
    Tatsis, E.
    Zoidis, N.
    Vlachopoulos, C.
    Matikas, T. E.
    Gotzamanis, A.
    EMERGING TECHNOLOGIES IN NON-DESTRUCTIVE TESTING V, 2012, : 131 - 135
  • [7] Risk of fire analysis in industrial constructions: Fire risk evaluation in industrial and commercial constructions
    Fontana, Mario
    VDI Berichte, 2009, (2062): : 159 - 174
  • [8] Probabilistic risk assessment for evacuation under building fire based on particle swarm optimization method
    Wang Jinhui
    Lu Shouxiang
    Zhang Xuelin
    PROGRESS IN SAFETY SCIENCE AND TECHNOLOGY, VOL 6, PTS A AND B, 2006, 6 : 390 - 393
  • [9] SUSTAINABLE METHODS TO ASSESS A TAX BUILDING
    Cretu, Raluca Florentina
    QUALITY-ACCESS TO SUCCESS, 2018, 19 : 195 - 201
  • [10] Discussion on Fire Risk Assessment Methods for a Building Based on System Engineering Theory
    Tian, Yumin
    PROCEEDINGS OF THE 10TH CONFERENCE ON MAN-MACHINE-ENVIRONMENT SYSTEM ENGINEERING, 2010, : 417 - 420