共 50 条
- [11] Fuzzy Comprehensive Benefit Evaluation of Different Land Management Mode: Semiarid Case Study in Fuxin North China ECOSYSTEM ASSESSMENT AND FUZZY SYSTEMS MANAGEMENT, 2014, 254 : 523 - 529
- [12] Research on Performance Evaluation of Construction project based Analytic Hierarchy Process and Fuzzy Comprehensive Evaluation PROCEEDINGS OF THE 2015 INTERNATIONAL CONFERENCE ON MANAGEMENT SCIENCE AND INNOVATIVE EDUCATION (MSIE 2015), 2015, 32 : 195 - 203
- [14] Risk Assessment of Electric Power Construction Project Based on AHP and the Fuzzy Comprehensive Evaluation PROCEEDINGS OF THE 1ST INTERNATIONAL CONFERENCE ON SUSTAINABLE CONSTRUCTION & RISK MANAGEMENT, VOLS I AND II, 2010, : 695 - 702
- [15] The Assessment of Construction Project Safety Management Security System Based on the Fuzzy Comprehensive Evaluation ICCREM 2017: PROJECT MANAGEMENT AND CONSTRUCTION TECHNOLOGY, 2017, : 262 - 271
- [16] Research on the Post Evaluation for Thermal Power Construction Project Based on Entropy Weight Fuzzy Comprehensive Evaluation PROCEEDINGS OF THE 2015 INTERNATIONAL CONFERENCE ON COMPUTER SCIENCE AND INTELLIGENT COMMUNICATION, 2015, 16 : 252 - 255
- [18] Study on Project Experts' Evaluation Based on Analytic Hierarchy Process and Fuzzy Comprehensive Evaluation INTERNATIONAL CONFERENCE ON INTELLIGENT COMPUTATION TECHNOLOGY AND AUTOMATION, VOL 1, PROCEEDINGS, 2008, : 941 - 945
- [20] Post Evaluation System of Nuclear Power Plant Construction Based on Comprehensive Fuzzy Theory PROCEEDINGS OF THE 2019 31ST CHINESE CONTROL AND DECISION CONFERENCE (CCDC 2019), 2019, : 4078 - 4082