Reply to the discussion by Fellenius on "A simplified nonlinear approach for single pile settlement analysis"

被引:0
作者
Zhang, Qian-qing [1 ,2 ]
机构
[1] Shandong Univ, Geotech & Struct Engn Res Ctr, Jinan 250100, Peoples R China
[2] China Univ Min & Technol, State Key Lab GeoMech & Deep Underground Engn, Xuzhou, Peoples R China
关键词
BORED PILES; BEHAVIOR;
D O I
10.1139/cgj-2013-0093
中图分类号
P5 [地质学];
学科分类号
0709 ; 081803 ;
摘要
引用
收藏
页码:688 / 692
页数:5
相关论文
共 16 条
[1]  
[Anonymous], 1993, 41302175 FED HIGHW A
[2]  
Bi G.P, 2003, PILE ENG TECHNOLOGY, P575
[3]  
Cheng Y., 2010, J ROCK MECH ENG, V29, P3885
[4]  
Ji L, 1998, PILE ENG TECHNOLOGY, P416
[5]  
LIU Jun-long, 2000, GEOTECHNICAL INVESTI, P8
[6]  
[王东红 Wang Donghong], 2005, [工程地质学报, Journal of Engineering Geology], V13, P117
[7]   Behaviour of jacked and driven piles in sandy soil [J].
Yang, J. ;
Tham, L. G. ;
Lee, P. K. K. ;
Chan, S. T. ;
Yu, F. .
GEOTECHNIQUE, 2006, 56 (04) :245-259
[8]   Field performance of long bored piles within piled rafts [J].
Zhang, Q. ;
Zhang, Z. ;
Yu, F. ;
Liu, J. .
PROCEEDINGS OF THE INSTITUTION OF CIVIL ENGINEERS-GEOTECHNICAL ENGINEERING, 2010, 163 (06) :293-305
[9]  
Zhang Q.Q., 2011, CHINESE J GEOTECHNIC, V33, P1600
[10]  
Zhang QQ, 2012, CAN GEOTECH J, V49, P1256, DOI [10.1139/T11-110, 10.1139/t11-110]