Single-machine group scheduling problems with deteriorating jobs

被引:60
作者
Wang, Ji-Bo [1 ]
Lin, Lin [1 ]
Shan, Feng [1 ]
机构
[1] Shenyang Inst Aeronaut Engn, Dept Sci, Shenyang 110136, Peoples R China
关键词
Scheduling; Single-machine; Deteriorating jobs; Group technology;
D O I
10.1007/s00170-007-1255-x
中图分类号
TP [自动化技术、计算机技术];
学科分类号
0812 ;
摘要
This paper investigates single-machine scheduling problems with deteriorating jobs and the group technology (GT) assumption. By deteriorating jobs and the group technology assumption, we mean that the group setup times and job processing times are both increasing functions of their starting times, i.e., the group setup times and job processing times are both described by a function which is proportional to a linear function of time. The two objectives of scheduling problems are to minimize the makespan and the total weighted completion time, respectively. We show that these problems remain solvable in polynomial time when deterioration and group technology are considered simultaneously.
引用
收藏
页码:808 / 812
页数:5
相关论文
共 19 条
[1]   Scheduling with time dependent processing times: Review and extensions [J].
Alidaee, B ;
Womer, NK .
JOURNAL OF THE OPERATIONAL RESEARCH SOCIETY, 1999, 50 (07) :711-720
[2]   A concise survey of scheduling with time-dependent processing times [J].
Cheng, TCE ;
Ding, Q ;
Lin, BMT .
EUROPEAN JOURNAL OF OPERATIONAL RESEARCH, 2004, 152 (01) :1-13
[3]   Pareto and scalar bicriterion optimization in scheduling deteriorating jobs [J].
Gawiejnowicz, S ;
Kurc, W ;
Pankowska, L .
COMPUTERS & OPERATIONS RESEARCH, 2006, 33 (03) :746-767
[5]  
Graham R. L., 1979, Discrete Optimisation, P287
[6]  
GUO AX, 2005, INT J PURE APPL MATH, V18, P225
[7]   Scheduling in a contaminated area: A model and polynomial algorithms [J].
Janiak, Adam ;
Kovalyov, Mikhail Y. .
EUROPEAN JOURNAL OF OPERATIONAL RESEARCH, 2006, 173 (01) :125-132
[8]   INTEGRATING SCHEDULING WITH BATCHING AND LOT-SIZING - A REVIEW OF ALGORITHMS AND COMPLEXITY [J].
POTTS, CN ;
VANWASSENHOVE, LN .
JOURNAL OF THE OPERATIONAL RESEARCH SOCIETY, 1992, 43 (05) :395-406
[9]   Two-machine flowshop scheduling to minimize mean flow time under simple linear deterioration [J].
Shiau, Yau-Ren ;
Lee, Wen-Chiung ;
Wu, Chin-Chia ;
Chang, Chia-Ming .
INTERNATIONAL JOURNAL OF ADVANCED MANUFACTURING TECHNOLOGY, 2007, 34 (7-8) :774-782
[10]   Flow shop scheduling with deteriorating jobs under dominating machines [J].
Wang, JB ;
Xia, ZQ .
OMEGA-INTERNATIONAL JOURNAL OF MANAGEMENT SCIENCE, 2006, 34 (04) :327-336