共 88 条
[1]
Adams W.F., 1936, Journal of the ICE, V4, P121, DOI DOI 10.1680/IJOTI.1936.14802
[2]
Estimation of Delay Induced by Downstream Operations at Signalized Intersections over Extended Control Time
[J].
JOURNAL OF TRANSPORTATION ENGINEERING-ASCE,
2013, 139 (01)
:8-19
[3]
AKCELIK R, 1988, ITE J, V58, P23
[4]
Akcelik R., 1981, 123 ARR AUSTR ROAD R
[5]
Akcelik R., 1980, Internal Report AIR 367-1
[6]
Akgungor A.P., 2004, TEKNOLOJI, V7, P369
[7]
Akgungor AP, 1999, P 69 ITE ANN M
[8]
[Anonymous], 2010, Highway Capacity Manual
[9]
[Anonymous], 1982, 3282 NAT COOP HIGHW
[10]
Aslan B., 2018, DUMF MUHENDISLIK DER, V9, P859