Determinants of the Severity of Contract Enforcement in Chinese PPP Projects: From Public Sector's Perspective

被引:2
作者
Zheng, Xiaodan [1 ]
Wang, Shaojie [1 ]
Yang, Yuchen [1 ]
机构
[1] Nanjing Forestry Univ, Coll Civil Engn, Nanjing 210037, Peoples R China
关键词
TRUST; ATTRIBUTIONS; PERFORMANCE; COMPETENCE; IMPACT; BLAME;
D O I
10.1155/2022/5149478
中图分类号
R1 [预防医学、卫生学];
学科分类号
1004 ; 120402 ;
摘要
In PPP projects, the enforcement of concession contract is of much importance. Thus, this study analyzed the severity of contract enforcement after private sectors violate concession contracts in Chinese PPP projects from the perspective of public sectors. Through 39 in-depth interviews with those working in public sectors under Chinese PPP projects, there were four determinants identified for the severity of contract enforcement in public sectors: the consequence of contract violations, the intention of contract violations, private sectors' remedies, and private sectors' prior performance. Furthermore, this study analyzed the intrinsic relationship between the four determinants with trust foundation, destruction, and repair. The findings of this study extend the existing theory on the severity of contract enforcement. For those managers working in public sectors, the findings of this study can help improve their flexibility in contract enforcement, thus contributing to the success of PPP projects.
引用
收藏
页数:8
相关论文
共 56 条
[1]  
[Anonymous], 2021, PPIWORLDBANK PPI DAT
[2]  
[Anonymous], 2008, ACAD MANAGE J
[3]   The severity of contract enforcement in interfirm channel relationships [J].
Antia, KD ;
Frazier, GL .
JOURNAL OF MARKETING, 2001, 65 (04) :67-81
[4]   Determining Optimal Capital Structure and Concession Period Length in BOT Scheme Using Trilateral Bargaining Game Model [J].
Bayat, Morteza ;
Khanzadi, Mostafa ;
Nasirzadeh, Farnad .
JOURNAL OF INFRASTRUCTURE SYSTEMS, 2019, 25 (01)
[5]   VICTIMS RESPONSES TO APOLOGIES - THE EFFECTS OF OFFENDER RESPONSIBILITY AND OFFENSE SEVERITY [J].
BENNETT, M ;
EARWAKER, D .
JOURNAL OF SOCIAL PSYCHOLOGY, 1994, 134 (04) :457-464
[6]   When talk is not cheap: Substantive penance and expressions of intent in rebuilding cooperation [J].
Bottom, WP ;
Gibson, K ;
Daniels, SE ;
Murnighan, JK .
ORGANIZATION SCIENCE, 2002, 13 (05) :497-513
[7]   Prior ties and trust development in project teams - A case study from the construction industry [J].
Buvik, Marte Pettersen ;
Rolfsen, Monica .
INTERNATIONAL JOURNAL OF PROJECT MANAGEMENT, 2015, 33 (07) :1484-1494
[8]  
Chen X.M., 2000, Qualitative research in social sciences
[9]  
Chen X.P., 2008, Empirical Methods In Organazation And Manaagment Research
[10]   Influence of Prior Ties on Trust in Contract Enforcement in the Construction Industry: Moderating Role of the Shadow of the Future [J].
Chen, Yuting ;
Chen, Yongqiang ;
Liu, Zhaojun ;
Yao, Hongjiang .
JOURNAL OF MANAGEMENT IN ENGINEERING, 2018, 34 (02)