A multi-mode resource-constrained project scheduling model with bi-random coefficients for drilling grouting construction project

被引:0
作者
Zhang, Zh. [1 ]
Xu, J. [2 ,3 ]
机构
[1] Nanjing Univ Sci & Technol, Sch Econ & Management, Nanjing 210094, Jiangsu, Peoples R China
[2] Sichuan Univ, State Key Lab Hydraul & Mt River Engn, Chengdu 610064, Peoples R China
[3] Sichuan Univ, Uncertainty Decis Making Lab, Chengdu 610064, Peoples R China
关键词
Optimization model; Large scale scheduling; Resource-constrained; Bi-random coefficients; Multi-mode; PARTICLE SWARM OPTIMIZATION; GENETIC ALGORITHM; MINIMUM; SEARCH;
D O I
暂无
中图分类号
TU [建筑科学];
学科分类号
0813 ;
摘要
To improve the construction efficiency of the Longtan Hydropower Project, this paper studies the multi-mode resource-constrained project scheduling problem in its Drilling Grouting Construction Project. A multiple objective decision making model with hi-random coefficients is first proposed for this practical problem to cope with hybrid uncertain environment where twofold randomness exists. Subsequently, to deal with the uncertainties, the chance constraint operator is introduced and the equivalent crisp model is derived. Furthermore, the particular nature of our model motivates us to develop particle swarm ptimization algorithm for the equivalent crisp model. Finally, the results generated by computer highlight the performances of the proposed model and algorithm in solving large-scale practical problems.
引用
收藏
页码:1 / 13
页数:13
相关论文
共 48 条