A multi-mode resource-constrained project scheduling model with bi-random coefficients for drilling grouting construction project

被引:0
作者
Zhang, Zh. [1 ]
Xu, J. [2 ,3 ]
机构
[1] Nanjing Univ Sci & Technol, Sch Econ & Management, Nanjing 210094, Jiangsu, Peoples R China
[2] Sichuan Univ, State Key Lab Hydraul & Mt River Engn, Chengdu 610064, Peoples R China
[3] Sichuan Univ, Uncertainty Decis Making Lab, Chengdu 610064, Peoples R China
关键词
Optimization model; Large scale scheduling; Resource-constrained; Bi-random coefficients; Multi-mode; PARTICLE SWARM OPTIMIZATION; GENETIC ALGORITHM; MINIMUM; SEARCH;
D O I
暂无
中图分类号
TU [建筑科学];
学科分类号
0813 ;
摘要
To improve the construction efficiency of the Longtan Hydropower Project, this paper studies the multi-mode resource-constrained project scheduling problem in its Drilling Grouting Construction Project. A multiple objective decision making model with hi-random coefficients is first proposed for this practical problem to cope with hybrid uncertain environment where twofold randomness exists. Subsequently, to deal with the uncertainties, the chance constraint operator is introduced and the equivalent crisp model is derived. Furthermore, the particular nature of our model motivates us to develop particle swarm ptimization algorithm for the equivalent crisp model. Finally, the results generated by computer highlight the performances of the proposed model and algorithm in solving large-scale practical problems.
引用
收藏
页码:1 / 13
页数:13
相关论文
共 48 条
  • [1] Alcaraz J., 2006, J OPERATIONAL RES SO, V54, P614
  • [2] [Anonymous], 1995, P ICNN 95 INT C NEUR
  • [3] Executing production schedules in the face of uncertainties: A review and some future directions
    Aytug, H
    Lawley, MA
    McKay, K
    Mohan, S
    Uzsoy, R
    [J]. EUROPEAN JOURNAL OF OPERATIONAL RESEARCH, 2005, 161 (01) : 86 - 110
  • [4] A new and efficient heuristic for scheduling projects with resource restrictions and multiple execution modes
    Boctor, FF
    [J]. EUROPEAN JOURNAL OF OPERATIONAL RESEARCH, 1996, 90 (02) : 349 - 361
  • [5] Resource-constrained project scheduling: Notation, classification, models, and methods
    Brucker, P
    Drexl, A
    Mohring, R
    Neumann, K
    Pesch, E
    [J]. EUROPEAN JOURNAL OF OPERATIONAL RESEARCH, 1999, 112 (01) : 3 - 41
  • [6] Properties of multi-mode resource-constrained project scheduling problems with resource vacations and activity splitting
    Buddhakulsomsiri, Jirachai
    Kim, David S.
    [J]. EUROPEAN JOURNAL OF OPERATIONAL RESEARCH, 2006, 175 (01) : 279 - 295
  • [7] AMPSO: A New Particle Swarm Method for Nearest Neighborhood Classification
    Cervantes, Alejandro
    Maria Galvan, Ines
    Isasi, Pedro
    [J]. IEEE TRANSACTIONS ON SYSTEMS MAN AND CYBERNETICS PART B-CYBERNETICS, 2009, 39 (05): : 1082 - 1091
  • [8] CHANCE-CONSTRAINED PROGRAMMING
    CHARNES, A
    COOPER, WW
    [J]. MANAGEMENT SCIENCE, 1959, 6 (01) : 73 - 79
  • [9] Demeulemeester E., 2002, Project Scheduling: A Research Handbook
  • [10] NONPREEMPTIVE MULTIMODE RESOURCE-CONSTRAINED PROJECT SCHEDULING
    DREXL, A
    GRUENEWALD, J
    [J]. IIE TRANSACTIONS, 1993, 25 (05) : 74 - 81