A two phase approach for the bi-objective non-convex combined heat and power production planning problem

被引:19
作者
Rong, Aiying [1 ]
Figueira, Jose Rui [2 ]
Lahdelma, Risto [3 ]
机构
[1] Univ Lisbon, ISEG, Cemapre Ctr Appl Math & Econ, P-1049001 Lisbon, Portugal
[2] Univ Lisbon, CEG, IST, P-1049001 Lisbon, Portugal
[3] Aalto Univ, Dept Energy Technol, Aalto 00076, Finland
关键词
Multi-objective optimization; Combined heat and power production; Mixed integer linear programming; Two phase method; EVOLUTIONARY ALGORITHMS; COGENERATION SYSTEMS; BOUND ALGORITHM; INTEGER; OPTIMIZATION; DISPATCH; MODEL; MANAGEMENT; SET;
D O I
10.1016/j.ejor.2015.02.037
中图分类号
C93 [管理学];
学科分类号
12 ; 1201 ; 1202 ; 120202 ;
摘要
In this paper, we deal-with the bi-objective non-convex combined heat and power (CHP) planning problem. A medium and long term planning problem decomposes into thousands of single period (hourly) subproblems and dynamic constraints can usually be ignored in this context. The hourly subproblem can be formulated as a mixed integer linear programming (MILP) model. First, an efficient two phase approach for constructing the Pareto Frontier (PF) of the hourly subproblem is presented. Then a merging algorithm is developed to approximate the PF for the multi-period planning problem. Numerical results with real CHP plants demonstrate the effectiveness and efficiency of the solution approach using the CPLEX based epsilon-constraint method as benchmark. (C) 2015 Elsevier B.V. All rights reserved.
引用
收藏
页码:296 / 308
页数:13
相关论文
共 66 条
[41]   A two phase method for multi-objective integer programming and its application to the assignment problem with three objectives [J].
Przybylski, Anthony ;
Gandibleux, Xavier ;
Ehrgott, Matthias .
DISCRETE OPTIMIZATION, 2010, 7 (03) :149-165
[42]  
Rong A, 2010, INTELLIGENT INFORM S, P296
[43]  
Rong A., 2005, P IASTED INT C EN PO, P6
[44]  
Rong A., 2006, THESIS U TURKU TURKU
[45]   An efficient envelope-based Branch and Bound algorithm for non-convex combined heat and power production planning [J].
Rong, Aiying ;
Lahdelma, Risto .
EUROPEAN JOURNAL OF OPERATIONAL RESEARCH, 2007, 183 (01) :412-431
[46]   CO2 emissions trading planning in combined heat and power production via multi-period stochastic optimization [J].
Rong, Aiying ;
Lahdelma, Risto .
EUROPEAN JOURNAL OF OPERATIONAL RESEARCH, 2007, 176 (03) :1874-1895
[47]   Efficient algorithms for combined heat and power production planning under the deregulated electricity market [J].
Rong, Aiying ;
Lahdelma, Risto .
EUROPEAN JOURNAL OF OPERATIONAL RESEARCH, 2007, 176 (02) :1219-1245
[48]   An efficient algorithm for bi-objective combined heat and power production planning under the emission trading scheme [J].
Rong, Aiying ;
Figueira, Jose Rui ;
Lahdelma, Risto .
ENERGY CONVERSION AND MANAGEMENT, 2014, 88 :525-534
[49]   An efficient linear model and optimisation algorithm for multi-site combined heat and power production [J].
Rong, AY ;
Hakonen, H ;
Lahdelma, R .
EUROPEAN JOURNAL OF OPERATIONAL RESEARCH, 2006, 168 (02) :612-632
[50]   Integrated business continuity and disaster recovery planning: Towards organizational resilience [J].
Sahebjamnia, N. ;
Torabi, S. A. ;
Mansouri, S. A. .
EUROPEAN JOURNAL OF OPERATIONAL RESEARCH, 2015, 242 (01) :261-273