Engineering measures for debris flow hazard mitigation in the Wenchuan earthquake area

被引:129
作者
Chen, Xiaoqing
Cui, Peng
You, Yong
Chen, Jiangang
Li, Deji
机构
[1] Chinese Acad Sci, Key Lab Mt Hazards & Earth Surface Proc, Chengdu 610041, Peoples R China
[2] Chinese Acad Sci, Inst Mt Hazards & Environm, Chengdu 610041, Sichuan, Peoples R China
[3] Minist Water Conservancy & Power, Chengdu 610041, Sichuan, Peoples R China
关键词
Debris flow; Engineering measures; Drainage channel; Check dam; Wenchuan earthquake; 13; AUGUST; 2010; SICHUAN; CHINA;
D O I
10.1016/j.enggeo.2014.10.002
中图分类号
P5 [地质学];
学科分类号
0709 ; 081803 ;
摘要
Avalanches and landslides caused by the Wenchuan earthquake in the Longmen Mountains area provide abundant loose solids for debris flows, and a large number of debris flows have occurred during the period 2008-2012. The engineering measures in certain gullies failed, causing serious damage and loss of life. Judging from the debris flow characteristics in the Wenchuan earthquake area, engineering measures should be better constructed after the active period of debris flows in severely affected areas. To reduce debris flow disasters, this paper proposes a mitigation method and design principle based on the transport capacity of the main river. A series of check dams with various opening sizes was designed by investigating and analyzing existing cases. Furthermore, a new type of drainage channel with prefabricated reinforced concrete boxes is proposed. Finally, a case study of the Xiaogangjian Gully, which is a typical debris flow gully in the Wenchuan earthquake area, is presented. This system of engineering measures is based on the main river's transport capacity and consists of five check dams with various opening sizes, a drainage channel with sidewalls constructed of prefabricated reinforced concrete boxes, and a debris flow basin at the base of the main gully. The debris flow mitigation measures constructed in the Xiaogang,jian Gully effectively resisted a debris flow with a 50-year return period that was triggered by rainfall on July 26, 2012. Specifically, these measures effectively protected a highway and minimized debris flow damage. Thus, the layout and engineered structures involved in this new engineering technique can provide a reference design for debris flow hazard mitigation. (C) 2014 Elsevier B.V. All rights reserved.
引用
收藏
页码:73 / 85
页数:13
相关论文
共 43 条
  • [1] [Anonymous], J GLACIOL GEOCRYOL
  • [2] Hybrid simulation of the initiation and runout characteristics of a catastrophic debris flow
    Chen Hong-Xin
    Zhang Li-Min
    Zhang Shuai
    Xiang Bo
    Wang Xiao-Feng
    [J]. JOURNAL OF MOUNTAIN SCIENCE, 2013, 10 (02) : 219 - 232
  • [3] Chen X., 2011, China Patent, Patent No. [201110108962.5, 2011101089625]
  • [4] [陈晓清 Chen Xiaoqing], 2006, [岩石力学与工程学报, Chinese Journal of Rock Mechanics and Engineering], V25, P106
  • [5] Volumetric analysis and hydrologic characterization of a modern debris flow near Yucca Mountain, Nevada
    Coe, JA
    Glancy, PA
    Whitney, JW
    [J]. GEOMORPHOLOGY, 1997, 20 (1-2) : 11 - 28
  • [6] Cui P., 2005, DEBRIS FLOW RES MITI, P81
  • [7] Cui P., 2010, China Patent, Patent No. [ZL 2010 1 0617466.8, 2010106174668]
  • [8] The Wenchuan Earthquake (May 12, 2008), Sichuan Province, China, and resulting geohazards
    Cui, Peng
    Chen, Xiao-Qing
    Zhu, Ying-Yan
    Su, Feng-Huan
    Wei, Fang-Qiang
    Han, Yong-Shun
    Liu, Hong-Jiang
    Zhuang, Jian-Qi
    [J]. NATURAL HAZARDS, 2011, 56 (01) : 19 - 36
  • [9] Cui Peng, 2010, Journal of Sichuan University, V42, P10
  • [10] Du R.H., 1980, P NAT DEBR FLOW C, P79