NUMERICAL ANALYSIS OF A NOVEL METHOD FOR SUBSEA EQUIPMENT INSTALLATION

被引:0
|
作者
Rateiro, Felipe [1 ]
Fucatu, Carlos H. [1 ]
Neves, Cassiano R. [2 ]
dos Santos, Melquisedec F. [2 ]
Tannuri, Eduardo A. [1 ]
机构
[1] Univ Sao Paulo, Numer Offshore Tank TPN, Sao Paulo, Brazil
[2] Subsea Integr Engenharia Subsin, Rio De Janeiro, Brazil
基金
巴西圣保罗研究基金会;
关键词
Subsea equipment installation; numerical analyses; damping; dynamic amplification;
D O I
暂无
中图分类号
P75 [海洋工程];
学科分类号
0814 ; 081505 ; 0824 ; 082401 ;
摘要
This paper and the companion paper OMAE2010-49946 (de Mello et al., 2011) present the experimental and numerical results of the analyses of a novel method for subsea equipment installation. The conventional procedure, which is usually used, may lead to dynamic amplifications, depending on the launching cable stiffness and length. In the proposed method the equipment is lowered using two tug boats in a Y configuration. Trough the control of their relative position and also of the cable length it is possible to diminish the tension amplification.
引用
收藏
页码:627 / +
页数:2
相关论文
共 50 条
  • [21] A dynamic model to evaluate the influence of the laying or retrieval speed on the installation and recovery of subsea equipment
    Tommasini, Rodrigo Batista
    Carvalho, Leonardo de Oliveira
    Pavanello, Renato
    APPLIED OCEAN RESEARCH, 2018, 77 : 34 - 44
  • [22] COUPLED TRANSIENT CFD AND DIFFRACTION MODELING FOR INSTALLATION OF SUBSEA EQUIPMENT/STRUCTURES IN SPLASH ZONE
    Jia, David
    Agrawal, Madhusuden
    PROCEEDINGS OF THE ASME 32ND INTERNATIONAL CONFERENCE ON OCEAN, OFFSHORE AND ARCTIC ENGINEERING - 2013 - VOL 7, 2013,
  • [23] Coupled Analysis of Vessel Dynamic Positioning and Heavy Subsea Device Lowering with Pendulous Installation Method
    Zhu, Xiaomeng
    Sun, Liping
    Li, Bin
    BASIC & CLINICAL PHARMACOLOGY & TOXICOLOGY, 2020, 126 : 190 - 191
  • [24] Planar multibody dynamics of floating Y-method installation system and the lowering of subsea equipment based on finite element modeling
    Ullah, Naeem
    Duan, Menglan
    Zheng, Miaozi
    Onuoha, Mac Darlington Uche
    Sajid, Muhammad
    MARINE STRUCTURES, 2023, 88
  • [25] Hybrid Subsea Foundations for Subsea Equipment
    Dimmock, P.
    Clukey, E.
    Randolph, M. F.
    Murff, D.
    Gaudin, C.
    JOURNAL OF GEOTECHNICAL AND GEOENVIRONMENTAL ENGINEERING, 2013, 139 (12) : 2182 - 2192
  • [26] Method aids execution, improves subsea equipment reliability
    Horan, C. S.
    Starkey, M. G.
    Lucas, D. C.
    Wheeler, S. A.
    OIL & GAS JOURNAL, 2007, 105 (44) : 43 - 48
  • [27] COMPARING THE RESULTS OF A SIMPLIFIED NUMERICAL MODEL WITH DNV GUIDELINES FOR INSTALLATION OF SUBSEA PLATFORMS
    Kimiaei, Mehrdad
    Xu JiaJing
    Yu, He
    OMAE 2009, VOL 1: OFFSHORE TECHNOLOGY, 2009, : 319 - 326
  • [28] NUMERICAL ANALYSIS FOR PIPELINE INSTALLATION BY S-LAY METHOD
    Wang, Li-Zhong
    Yuan, Feng
    Guo, Zhen
    PROCEEDINGS OF THE ASME 29TH INTERNATIONAL CONFERENCE ON OCEAN, OFFSHORE AND ARCTIC ENGINEERING 2010, VOL 5, PTS A AND B, 2010, : 591 - 599
  • [29] Numerical Analysis for Cutting a Subsea Bundle
    Chanaa, Ahmad
    Ivanovic, Ana
    Hastings, Astley
    JOURNAL OF OFFSHORE MECHANICS AND ARCTIC ENGINEERING-TRANSACTIONS OF THE ASME, 2025, 147 (02):
  • [30] Reliable Subsea Equipment
    Deans, Gregor
    MEASUREMENT & CONTROL, 2009, 42 (04): : 118 - 122