Lead time anticipation in Supply Chain Operations Planning

被引:12
作者
Jansen, Michiel M. [1 ]
de Kok, Ton G. [1 ]
Fransoo, Jan C. [1 ]
机构
[1] Eindhoven Univ Technol, Sch Ind Engn, NL-5600 MB Eindhoven, Netherlands
关键词
Supply chain management; Hierarchical production planning; Lead time anticipation; Production smoothing; SIMULATION; MODELS;
D O I
10.1007/s00291-011-0267-y
中图分类号
C93 [管理学]; O22 [运筹学];
学科分类号
070105 ; 12 ; 1201 ; 1202 ; 120202 ;
摘要
Linear programming (LP) models for Supply Chain Operations Planning are widely used in Advanced Planning Systems. The solution to the LP model is a proposal for order releases to the various production units (PU) in the supply network. There is a non-linear relationship between the work-in-process in the PU and the lead time that is difficult to capture in the LP model formulation. We propose a two-step lead time anticipation (LTA) procedure where the LP model is first solved irrespective of the available production capacity and is subsequently updated with aggregate order release targets. The order release targets are generated by a local smoothing algorithm that accounts for the evolution of the stochastic workload in the PU. A solution that is both feasible with respect to the planned lead time and meets the material requirements may not exist. By means of discrete event simulation, we compare a conservative strategy where the production quantities are reduced to an optimistic strategy where the planned lead time constraint is allowed to be violated.
引用
收藏
页码:251 / 290
页数:40
相关论文
共 35 条
[1]  
[Anonymous], MANUFACTURING LEAD T
[2]  
[Anonymous], MULTIECHELON PRODUCT
[3]  
[Anonymous], THESIS GEORGIA I TEC
[4]  
[Anonymous], TECHNICAL REPORT
[5]  
[Anonymous], STOCHASTIC MODELING
[6]  
[Anonymous], 2006, Simulation modeling and analysis
[7]  
[Anonymous], TECHNICAL REPORT
[8]  
[Anonymous], HDB OPERATIONS RES M
[9]  
[Anonymous], THESIS EINDHOVEN U T
[10]  
[Anonymous], INT J PROD IN PRESS