Minimizing makespan and throughput times at Aalsmeer flower auction

被引:20
作者
de Koster, R. [1 ]
Yu, M. [1 ]
机构
[1] RSM Erasmus Univ, NL-3000 DR Rotterdam, Netherlands
关键词
distribution; simulation; heuristics; optimization; practice of OR;
D O I
10.1057/palgrave.jors.2602474
中图分类号
C93 [管理学];
学科分类号
12 ; 1201 ; 1202 ; 120202 ;
摘要
At Bloemenveiling Aalsmeer (VBA), about 19 million flowers have to be distributed daily to customers in a building of 1 million m(2) within a few hours. With the increasing daily number of customer orders, the congestion in the main distribution area increases. As a consequence, the makespan exceeds the available time, and flowers arrive too late at the customers. This paper investigates the concept of zoning in the distribution process, where distributors work in teams for a fixed group of customers in a specific zone of the distribution area. Customers are assigned to zones to balance workload. We show by simulation that this way of organizing the distribution process reduces congestion and leads to considerable improvements in both makespan and transaction lead time.
引用
收藏
页码:1182 / 1190
页数:9
相关论文
共 9 条
[1]   Design and control of warehouse order picking: A literature review [J].
de Koster, Rene ;
Le-Duc, Tho ;
Roodbergen, Kees Jan .
EUROPEAN JOURNAL OF OPERATIONAL RESEARCH, 2007, 182 (02) :481-501
[2]  
Jane C. C., 2000, International Journal of Physical Distribution & Logistics Management, V30, P55, DOI [10.1108/09600030010307984, DOI 10.1108/09600030010307984]
[3]   A clustering algorithm for item assignment in a synchronized zone order picking system [J].
Jane, CC ;
Laih, YW .
EUROPEAN JOURNAL OF OPERATIONAL RESEARCH, 2005, 166 (02) :489-496
[4]  
LEDUC T, 2005, ERS2005029LIS RSM ER
[5]   THE DYNAMICS OF LEARNING WITH TEAM PRODUCTION - IMPLICATIONS FOR TASK ASSIGNMENT [J].
MEYER, MA .
QUARTERLY JOURNAL OF ECONOMICS, 1994, 109 (04) :1157-1184
[6]   A productivity evaluation of teamwork at an aluminum manufacturing plant [J].
Moses, TP ;
Stahelski, AJ .
GROUP & ORGANIZATION MANAGEMENT, 1999, 24 (03) :391-412
[7]   Considerations in order picking zone configuration [J].
Petersen, CG .
INTERNATIONAL JOURNAL OF OPERATIONS & PRODUCTION MANAGEMENT, 2002, 22 (7-8) :793-805
[8]  
SCHILDER J, 1992, PERS J, V71, P67
[9]  
YU M, 2006, PERFORMANCE APPROXIM