Comparative analysis between FAR and ARL based control charts with runs rules

被引:6
作者
Mehmood, Rashid [1 ]
Lee, Muhammad Hisyam [1 ]
Ali, Iftikhar [2 ]
Riaz, Muhammad [3 ]
机构
[1] Univ Teknol Malaysia, Dept Math Sci, Skudai, Malaysia
[2] Univ Hafr Al Batin, Dept Math, Al Batin, Saudi Arabia
[3] King Fahad Univ Petr & Minerals, Dept Math & Stat, Dhahran, Saudi Arabia
来源
HACETTEPE JOURNAL OF MATHEMATICS AND STATISTICS | 2021年 / 50卷 / 01期
关键词
Average run length; control chart; false alarm rate; performance indicators; power; probability of single point; runs rules;
D O I
10.15672/hujms.758925
中图分类号
O1 [数学];
学科分类号
0701 ; 070101 ;
摘要
In this study, we have conducted comparative analysis between false alarm rate (FAR) and average run length (ARL) based control charts with runs rules. In this regard, we have considered various univariate and multivariate control charts which include mean, standard deviation, variance, Hotelling, and generalized variance. For evaluation purpose, we have used actual false alarm rate, power, in-control actual average run length, and out-of-control average run length as performance indicators. Furthermore, the performance indicators are calculated through Monte Carlo simulation procedures. Results revealed that performance order of runs rules with FAR based control charts are persistent whereas, performance order of runs rules with ARL based control charts are dependent on the circumstances, that is, sample size, size of shift, type of control chart, and side of control limit (upper-sided and lower-sided). Besides, we have provided a real life example using the data on electrical resistance of insulation. In this approach, we have determined that behavior of FAR and ARL based control charts using the real data is recorded similar to the behavior using the statistical performance indicators.
引用
收藏
页码:275 / 288
页数:14
相关论文
共 22 条
[1]  
Alwan, 2000, STAT PROCESS ANAL
[2]   A nonparametric Shewhart-type signed-rank control chart based on runs [J].
Chakraborti, S. ;
Eryilmaz, S. .
COMMUNICATIONS IN STATISTICS-SIMULATION AND COMPUTATION, 2007, 36 (02) :335-356
[3]   EXACT RESULTS FOR SHEWHART CONTROL CHARTS WITH SUPPLEMENTARY RUNS RULES [J].
CHAMP, CW ;
WOODALL, WH .
TECHNOMETRICS, 1987, 29 (04) :393-399
[4]  
Electric Western., 1956, Statistical Quality Control Handbook
[5]  
Khoo M. B., 2003, Quality Engineering, V16, P27, DOI 10.1081/QEN-120020769
[6]   Two alternatives to the Shewhart (X)over-bar control chart [J].
Klein, M .
JOURNAL OF QUALITY TECHNOLOGY, 2000, 32 (04) :427-431
[7]  
Malela-Majika J.C., 2020, COMMUN STAT-THEOR M, P1
[8]   Hotelling T2 control chart based on bivariate ranked set schemes [J].
Mehmood, Rashid ;
Lee, Muhammed Hisyam ;
Riaz, Muhammad ;
Zaman, Baber ;
Ali, Iftikhar .
COMMUNICATIONS IN STATISTICS-SIMULATION AND COMPUTATION, 2022, 51 (01) :1-28
[9]   On the performance of (X)over-bar control chart for known and unknown parameters supplemented with runs rules under different probability distributions [J].
Mehmood, Rashid ;
Qazi, Miss Sara ;
Riaz, Muhammad .
JOURNAL OF STATISTICAL COMPUTATION AND SIMULATION, 2018, 88 (04) :675-711
[10]   On the extended use of auxiliary information under skewness correction for process monitoring [J].
Mehmood, Rashid ;
Riaz, Muhammad ;
Mahmood, Tahir ;
Abbasi, Saddam Akbar ;
Abbas, Nasir .
TRANSACTIONS OF THE INSTITUTE OF MEASUREMENT AND CONTROL, 2017, 39 (06) :883-897