共 50 条
- [41] Scheduling Cluster Tools with Multi-Space Process Modules and a Multi-Finger-Arm Robot in Wafer Fabrication Subject to Wafer Residency Time Constraints APPLIED SCIENCES-BASEL, 2024, 14 (20):
- [45] Buffer Space Configuration and Scheduling Analysis of Single-Arm Multi-cluster Tools 2016 13TH INTERNATIONAL WORKSHOP ON DISCRETE EVENT SYSTEMS (WODES), 2016, : 349 - 354
- [46] Scheduling of Time-Constrained Single-Arm Cluster Tools with Two-Space Process Modules in Semiconductor Manufacturing IEEE ROBOTICS AND AUTOMATION LETTERS, 2024, 9 (07): : 6352 - 6359
- [48] Petri Net Modeling and Scheduling of a Close-Down Process for Time-Constrained Single-Arm Cluster Tools IEEE TRANSACTIONS ON SYSTEMS MAN CYBERNETICS-SYSTEMS, 2018, 48 (03): : 389 - 400
- [50] An optimal periodic scheduler for dual-arm robots in cluster tools with residency constraints IEEE TRANSACTIONS ON ROBOTICS AND AUTOMATION, 2001, 17 (05): : 609 - 618