A Novel Failure Response Policy for Single-arm Cluster Tools with Residency Time Constraints

被引:0
|
作者
Qiao, Yan [1 ]
Wu, NaiQi [2 ]
Pan, ChunRong [3 ]
Zhou, MengChu [3 ]
机构
[1] Guangdong Univ Technol, Sch Electromech Engn, Guangzhou 510006, Guangdong, Peoples R China
[2] Macau Univ Sci & Technol, Inst Syst Engn, Taipa, Macau, Peoples R China
[3] New Jersey Inst Technol, Dept ECE, Newark, NJ 07102 USA
来源
2014 IEEE INTERNATIONAL CONFERENCE ON SYSTEMS, MAN AND CYBERNETICS (SMC) | 2014年
关键词
Wafer fabrication; Cluster tools; Petri net; Scheduling; Failure response; SCHEDULING ANALYSIS; MULTICLUSTER TOOLS; EVENT GRAPH; PETRI NETS; SYSTEMS; MODEL;
D O I
暂无
中图分类号
TP18 [人工智能理论];
学科分类号
081104 ; 0812 ; 0835 ; 1405 ;
摘要
It is very challenging to schedule a residency time-constrained single-arm cluster tool with failure-prone process modules. In some cases, when a failure occurs, the degraded tool is not schedulable. However, it is highly desired to respond to a process module failure properly such that the tool can continue working and the wafers in the tool can be completed in a feasible way. Thus, in this paper, Petri net models are developed to describe the discrete-event behavior of a single-arm cluster tool. With the models, failure response policies are given to control the cluster tool such that it can keep working without violating any residency time constraints. They are implemented via efficient real-time control laws. Illustrative examples are presented to show their usage.
引用
收藏
页码:120 / 126
页数:7
相关论文
共 50 条
  • [41] Scheduling Cluster Tools with Multi-Space Process Modules and a Multi-Finger-Arm Robot in Wafer Fabrication Subject to Wafer Residency Time Constraints
    Gu, Lei
    Wu, Naiqi
    Qiao, Yan
    Zhang, Siwei
    Li, Tan
    APPLIED SCIENCES-BASEL, 2024, 14 (20):
  • [42] Scheduling Transient Processes for Time-Constrained Single-Arm Robotic Multi-Cluster Tools
    Zhu, QingHua
    Zhou, MengChu
    Qiao, Yan
    Wu, Naiqi
    IEEE TRANSACTIONS ON SEMICONDUCTOR MANUFACTURING, 2017, 30 (03) : 261 - 269
  • [43] Wafer Delay Minimization in Scheduling Single-Arm Cluster Tools with Two-Space Process Modules
    Zou, Chengyu
    Zhang, Siwei
    Zeng, Shan
    Gu, Lei
    Li, Jie
    MATHEMATICS, 2024, 12 (12)
  • [44] Scheduling of time-constrained single-arm cluster tools with purge operations in wafer fabrications
    Yuan, Fenglian
    Zhao, Qingling
    Huang, Bo
    Pan, Chunrong
    JOURNAL OF SYSTEMS ARCHITECTURE, 2023, 134
  • [45] Buffer Space Configuration and Scheduling Analysis of Single-Arm Multi-cluster Tools
    Bai, LiPing
    Wu, NaiQi
    Li, ZhiWu
    Zhou, MengChu
    2016 13TH INTERNATIONAL WORKSHOP ON DISCRETE EVENT SYSTEMS (WODES), 2016, : 349 - 354
  • [46] Scheduling of Time-Constrained Single-Arm Cluster Tools with Two-Space Process Modules in Semiconductor Manufacturing
    Zou, ChengYu
    Wang, GengHong
    Gu, Lei
    Li, Jie
    Wu, NaiQi
    Qiao, Yan
    IEEE ROBOTICS AND AUTOMATION LETTERS, 2024, 9 (07): : 6352 - 6359
  • [47] Petri Net-Based Scheduling of Single-Arm Cluster Tools With Reentrant Atomic Layer Deposition Processes
    Wu, NaiQi
    Chu, Feng
    Chu, Chengbin
    Zhou, MengChu
    IEEE TRANSACTIONS ON AUTOMATION SCIENCE AND ENGINEERING, 2011, 8 (01) : 42 - 55
  • [48] Petri Net Modeling and Scheduling of a Close-Down Process for Time-Constrained Single-Arm Cluster Tools
    Zhu, QingHua
    Zhou, MengChu
    Qiao, Yan
    Wu, Naiqi
    IEEE TRANSACTIONS ON SYSTEMS MAN CYBERNETICS-SYSTEMS, 2018, 48 (03): : 389 - 400
  • [49] Scheduling algorithm of dual-armed cluster tools with residency time and reentrant constraints
    Zhou Bing-hai
    Gao Zhong-shun
    Chen Jia
    JOURNAL OF CENTRAL SOUTH UNIVERSITY, 2014, 21 (01) : 160 - 166
  • [50] An optimal periodic scheduler for dual-arm robots in cluster tools with residency constraints
    Rostami, S
    Hamidzadeh, B
    Camporese, D
    IEEE TRANSACTIONS ON ROBOTICS AND AUTOMATION, 2001, 17 (05): : 609 - 618