A Novel Genetic Simulated Annealing Algorithm for No-wait Hybrid Flowshop Problem with Unrelated Parallel Machines

被引:11
作者
Xuan, Hua [1 ,2 ]
Zheng, Qianqian [3 ]
Li, Bing [3 ,4 ]
Wang, Xueyuan [3 ]
机构
[1] Northeaster Univ, Shenyang, Liaoning, Peoples R China
[2] Zhengzhou Univ, Sch Management Engn, 100 Sci Rd, Zhengzhou 450001, Henan, Peoples R China
[3] Zhengzhou Univ, 100 Sci Rd, Zhengzhou 450001, Henan, Peoples R China
[4] Southweast Jiaotong Univ, Chengdu, Sichuan, Peoples R China
基金
中国国家自然科学基金;
关键词
hybrid flowshop; unrelated parallel machines; no-wait constraints; total flowtime; genetic simulated annealing algorithm; SHOP SCHEDULING PROBLEM; HEURISTIC ALGORITHMS; FLEXIBLE FLOWSHOP; 2-STAGE; MAKESPAN; TIME;
D O I
10.2355/isijinternational.ISIJINT-2020-258
中图分类号
TF [冶金工业];
学科分类号
0806 ;
摘要
This paper studies the problem of scheduling N jobs in a hybrid flowshop with unrelated parallel machines at each stage. Considering the practical application of the presented problem, no-wait constraints and the objective function of total flowtime are included in the scheduling problem. A mathematical model is constructed and a novel genetic simulated annealing algorithm so-called GSAA are developed to solve this problem. In the algorithm, firstly a modified NEH algorithm is proposed to obtain the initial population. A two-dimensional matrix encoding scheme for scheduling solutions is designed and an insertion-translation approach are employed for decoding in order to meet no-wait constraints. Afterwards, to avoid GA premature and enhance search ability, an adaptive adjustment strategy is imposed on the crossover and mutation operators. In addition, a SA procedure is implemented for some better individuals from the GA solutions to complete re-optimization, where five neighborhood search structures are constructed including job based exchange, gene based exchange, gene based insertion, job based mutation, and gene based mutation. Finally, various simulation experiments in two scales of small-medium and large are established. Computational results show that the presented algorithm performs much more effectively compared with several heuristic algorithms reported in the literature.
引用
收藏
页码:258 / 268
页数:11
相关论文
共 35 条
  • [21] Rahmanidoust M., 2017, Int. Bus. Res., V10, P197, DOI [10.5539/ibr.v10n12p197, DOI 10.5539/IBR.V10N12P197]
  • [22] No-wait flexible flowshop with uniform parallel machines and sequence-dependent setup time: a hybrid meta-heuristic approach
    Ramezani, Pezhman
    Rabiee, Meysam
    Jolai, Fariborz
    [J]. JOURNAL OF INTELLIGENT MANUFACTURING, 2015, 26 (04) : 731 - 744
  • [23] A new hybrid ant colony algorithm for scheduling of no-wait flowshop
    Riahi, Vahid
    Kazemi, Morteza
    [J]. OPERATIONAL RESEARCH, 2018, 18 (01) : 55 - 74
  • [24] THE 3-MACHINE NO-WAIT FLOWSHOP IS NP-COMPLETE
    ROCK, H
    [J]. JOURNAL OF THE ACM, 1984, 31 (02) : 336 - 345
  • [25] Salvador M. S., 1973, LECT NOTES ECON MATH, V86, P83
  • [26] A Pareto-Based Estimation of Distribution Algorithm for Solving Multiobjective Distributed No-Wait Flow-Shop Scheduling Problem With Sequence-Dependent Setup Time
    Shao, Weishi
    Pi, Dechang
    Shao, Zhongshi
    [J]. IEEE TRANSACTIONS ON AUTOMATION SCIENCE AND ENGINEERING, 2019, 16 (03) : 1344 - 1360
  • [27] A novel hybrid estimation of distribution algorithm for solving hybrid flowshop scheduling problem with unrelated parallel machine
    Sun Ze-wen
    Gu Xing-sheng
    [J]. JOURNAL OF CENTRAL SOUTH UNIVERSITY, 2017, 24 (08) : 1779 - 1788
  • [28] Tao Z., 2015, TOAUTOCJ, V6, P593, DOI [10.2174/1874444301406010593, DOI 10.2174/1874444301406010593]
  • [29] A branch-and-bound algorithm for two-stage no-wait hybrid flow-shop scheduling
    Wang, Shijin
    Liu, Ming
    Chu, Chengbin
    [J]. INTERNATIONAL JOURNAL OF PRODUCTION RESEARCH, 2015, 53 (04) : 1143 - 1167
  • [30] A genetic algorithm for two-stage no-wait hybrid flow shop scheduling problem
    Wang, Shijin
    Liu, Ming
    [J]. COMPUTERS & OPERATIONS RESEARCH, 2013, 40 (04) : 1064 - 1075